Line 1: | Line 1: |
== Period == . ~+April 2009 - June 2009+~ |
|
Line 2: | Line 5: |
~+''' | ~+ |
Line 5: | Line 8: |
'''+~ | +~ |
Period
April 2009 - June 2009
Top-priority
- 低温での常温感度再現
- 低温時 noise budget 作成作業業
Small Tasks & Schedules
コイルボビン (担当:内山) 75% done @ 2009/06/15 / due: 2009/09/End
エンド光 (担当:三代木) 50% done @ 2009/06/15 due: 2009/06/End
デジタル化アナログフロントエンド・第2段 (担当:辰巳)
- RF intensity noise investigation (担当:我妻)
- BS pendulum modification (担当:三代木) start:2009/06
- ST pendulum modification (担当:三代木) start:2009/06
Pending Tasks
- MC WFS and beam orientation control (担当:我妻)
- Arm cavity WFS or dithering (担当:我妻) 優先度:高Dithering 相当のシステムを早急に構築する必要あり。
- Main suspension Y-stage installation (担当:内山)
- Up-conversion noise investigation (担当:新井)
- Shadow sensor (担当:辰巳、高橋)
Past small Tasks
デジタル化アナログフロントエンド・第1段(担当:辰巳) due: 2009/3/End
アクチュエイター雑音低減・第1段 (担当:辰巳) due: 2009/3/End
粗調ビームセンターリング (担当:新井) design due: 2009/1/8, deliver due 2009/1/End, preparation ends 2009/2/6