Line 5: Line 5:
 * Report of work (*:responsible person) === Report of work (*:responsible person) ===
 * Alignment: Enomoto, Izumi
  * Beam has been lead to the REFL port. No need to vent after stopping the pump in the week of 3/26.
Line 7: Line 9:
  * Alignment: Enomoto, Izumi
   * Beam has been lead to the REFL port. No need to vent after stopping the pump in the week of 3/26.
 * AOS: Akutsu, Michimura
  * We replace all the items which were not compatible to vacuum.
Line 10: Line 12:
  * AOS: Akutsu, Michimura
   * We replace all the items which were not compatible to vacuum.
 * Tcam:
  * Tcam of ETMY was recovered. Team of ITMX can be seen in visible light.
Line 13: Line 15:
  * Tcam:
   * Tcam of ETMY was recovered. Team of ITMX can be seen in visible light.
 * CRY: mirror temperature 24K.
Line 16: Line 17:
  * CRY: mirror temperature 24K. === Work plan (*:responsible person) ===
 * Alignment: Enomoto
  * PD at BS will be moved to REFL.
  * Connection of PD signal to DAQ should be implemented this week or next week.
  * GigE camera should be placed at the REFL port eventually.
Line 18: Line 23:
 * Work plan (*:responsible person)  * AOS: Akutsu, Michimura
  * Alignment of green light to ETMY will be finished today.
Line 20: Line 26:
  * Alignment: Enomoto
   * PD at BS will be moved to REFL.
   * Connection of PD signal to DAQ should be implemented this week or next week.
   * GigE camera should be placed at the REFL port eventually.

  * AOS: Akutsu, Michimura
   * Alignment of green light to ETMY will be finished today.

 * Laser hazard:
  * AM: Around PR2 for green, Y-end for IR.
  * PM: Around PR2 for green, upstream SR2-3 line for IR.
=== Laser hazard ===
 * AM: Around PR2 for green, Y-end for IR.
 * PM: Around PR2 for green, upstream SR2-3 line for IR.
Line 33: Line 31:
 * Weekly
  * week of 3/5
  * 3/5 Exchanging items and cleaning inside the PR2 chamber
   * 3/8 IYC door will be closed.
=== Weekly ===
 * week of 3/5
  * 3/5 Exchanging items and cleaning inside the PR2 chamber
  * 3/8 IYC door will be closed.
Line 38: Line 36:
  * week of 3/12
  * TMS installation at ETMY.
  * Connecting ducts at the corner area.
 * week of 3/12
  * TMS installation at ETMY.
  * Connecting ducts at the corner area.
Line 42: Line 40:
  * week of 3/19
  * Vacuum test at at the corner area.
  * TMS alignment using green light at ETMY.
   * Beam alignment to REFL port.
 * week of 3/19
  * Vacuum test at at the corner area.
  * TMS alignment using green light at ETMY.
  * Beam alignment to REFL port.

2017/3/6(Wed.)

  • Remote participants by eZuce: Izumi

Report of work (*:responsible person)

  • Alignment: Enomoto, Izumi
    • Beam has been lead to the REFL port. No need to vent after stopping the pump in the week of 3/26.
  • AOS: Akutsu, Michimura
    • We replace all the items which were not compatible to vacuum.
  • Tcam:
    • Tcam of ETMY was recovered. Team of ITMX can be seen in visible light.
  • CRY: mirror temperature 24K.

Work plan (*:responsible person)

  • Alignment: Enomoto
    • PD at BS will be moved to REFL.
    • Connection of PD signal to DAQ should be implemented this week or next week.
    • GigE camera should be placed at the REFL port eventually.
  • AOS: Akutsu, Michimura
    • Alignment of green light to ETMY will be finished today.

Laser hazard

  • AM: Around PR2 for green, Y-end for IR.
  • PM: Around PR2 for green, upstream SR2-3 line for IR.

Weekly

  • week of 3/5
    • 3/5 Exchanging items and cleaning inside the PR2 chamber
    • 3/8 IYC door will be closed.
  • week of 3/12
    • TMS installation at ETMY.
    • Connecting ducts at the corner area.
  • week of 3/19
    • Vacuum test at at the corner area.
    • TMS alignment using green light at ETMY.
    • Beam alignment to REFL port.
  • Issues