=== Report of work (*:responsible person) ===
 * Alignment: Enomoto, Izumi
==== Report of work (*:responsible person) ====
 * Alignment: Enomoto, *Izumi
Line 9: Line 9:
 * AOS: Akutsu, Michimura  * AOS: *Akutsu, Michimura
Line 12: Line 12:
 * Tcam:  * Tcam: *Inoue, Cory, Binhua
Line 17: Line 17:
=== Work plan (*:responsible person) ===
 * Alignment: Enomoto
==== Work plan (*:responsible person) ====
 * Alignment: *Enomoto
Line 23: Line 23:
 * AOS: Akutsu, Michimura  * AOS: *Akutsu, Michimura
Line 26: Line 26:
=== Laser hazard === ==== Laser hazard ====
Line 31: Line 31:
=== Weekly === ==== Weekly ====

2017/3/6(Wed.)

  • Remote participants by eZuce: Izumi

Report of work (*:responsible person)

  • Alignment: Enomoto, *Izumi
    • Beam has been lead to the REFL port. No need to vent after stopping the pump in the week of 3/26.
  • AOS: *Akutsu, Michimura
    • We replace all the items which were not compatible to vacuum.
  • Tcam: *Inoue, Cory, Binhua
    • Tcam of ETMY was recovered. Team of ITMX can be seen in visible light.
  • CRY: mirror temperature 24K.

Work plan (*:responsible person)

  • Alignment: *Enomoto
    • PD at BS will be moved to REFL.
    • Connection of PD signal to DAQ should be implemented this week or next week.
    • GigE camera should be placed at the REFL port eventually.
  • AOS: *Akutsu, Michimura
    • Alignment of green light to ETMY will be finished today.

Laser hazard

  • AM: Around PR2 for green, Y-end for IR.
  • PM: Around PR2 for green, upstream SR2-3 line for IR.

Weekly

  • week of 3/5
    • 3/5 Exchanging items and cleaning inside the PR2 chamber
    • 3/8 IYC door will be closed.
  • week of 3/12
    • TMS installation at ETMY.
    • Connecting ducts at the corner area.
  • week of 3/19
    • Vacuum test at at the corner area.
    • TMS alignment using green light at ETMY.
    • Beam alignment to REFL port.
  • Issues