Daily meeting
- Date and time: Every weekday, 1PM
- ~10min, as short as possible
- Location: Control room and Fan hut connected by eZuce
2018/8/31(Fri.)
- PSL for high-power laser will finish by 8/31 and they provides the high power laser to the interferometer.
- Out put of PSL will be few Watts.
- Safety for the high power laser should be announced.
- Actual night work will start 9/3 (9/1, 9/2 are weekends).
- We will have a daily meeting on 9/3 that is the first day of night work managed by Izumi.
- Furuta-san will attend this meeting every day to tell the laser hazard for Engineers.
- One Car (Serena) will be assigned to commissioning work.
Attendance
- Control room: Miyakawa, Tomura, Miyamoto
- Fan hut: Furuta
- educe:
Laser hazard
|
Before 3PM |
After 3PM |
|
|
|
||
Center |
upstream IMM |
IR |
IR |
|
PSL |
IR & Green |
IR & Green |
X end 1F |
IR |
IR |
|
Y end 1F |
N/A |
N/A |
Transition from morning work (*:responsible person)
- Alignment of IFI dose not point center of IMMT1. It goes to 1.5cm right of IMMT1. It seems to have no clip at IMMT1.
- We should discuss that we move IMMT1.
Report of work (*:responsible person)
- EX camera anad illuminator are recovered.