Differences between revisions 1 and 2
Revision 1 as of 2019-03-07 09:16:42
Size: 2522
Comment:
Revision 2 as of 2019-03-07 09:45:49
Size: 2349
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
  * 2/28-3/6: Health check and maintenance for VIS   * 2/28-3/15: Health check and maintenance for VIS
Line 8: Line 8:
   * PRM: Misalignment does not reach where beam hits damper. -> 3/4-6
   * --(3/5
PR3: range -> incline by 20-30mrad at mirror because of bistable. -> 3/5)--
   *
BS: Yaw offset adjustment by hand. -> 3/5-6
   * 3/4-8 PRM: Misalignment does not reach where beam hits damper.
   * --(3/
6 PR3: range -> incline by 20-30mrad at mirror because of bistable.)--
   * ~3/1
5 BS: Yaw offset adjustment by hand. -> 3/5-6
Line 12: Line 12:
  * Postponed: 3/2-6: Re-alignment
Line 14: Line 13:
  * Postponed: 3/7: Closing
  * Postponed: 3/8: pump down
  * 3/18-19: Re-alignment
  *
3/19: Closing
  * 3/20: pump down
Line 23: Line 23:
  * Postponed: Alignment to ETMX by 3/7 morning
Line 33: Line 32:
   * Beam position by IR and Green
  * 3/5 and 3/11~: ETMX seems to be hitting somewhere? Tuning was not enough(by Takahashi).
  * 3/6: ETMX aligned with oplev accuracy
  * 3/5:
AOS EY and EX(if they have time) work.
  * 3/6: Green X alignment (no IR), and no hazard at Y end.
  * 3/9
-10(fastest, then 3/23): Pcal finalization
   * --(3/6: Beam position by IR and Green)--
  * --(3/5 AOS: EY and EX(if they have time) work.)--
  * --(3/6: Green X alignment (no IR), and no hazard at Y end.)--
Line 40: Line 36:
  * ~3/15: ETMX tuning.
Line 42: Line 39:
  * 3/18,19: ETMX alignement
Line 46: Line 44:
 * 3/11~ : Night work starts, daily meeting will be moved to 1PM  * 3/18~ : Night work starts, daily meeting will be moved to 1PM
Line 49: Line 47:
 * 2/18-3/22 DRMI commissioning
 * 3/11-4/5 Y arm commissioning
 * 3/25-4/5 FPMI commissioning
 * 2/18-3/22(?postponed): DRMI commissioning
 * 3/25-4/19: Y arm commissioning
 * 3/25-4/19: FPMI commissioning

2019/3/7(Thur.)

Schedule

  • Center
    • 2/26-27: Venting

    • 2/28-3/15: Health check and maintenance for VIS
      • PRM: One flag was dropped. -> leave it

      • 3/4-8 PRM: Misalignment does not reach where beam hits damper.
      • 3/6 PR3: range -> incline by 20-30mrad at mirror because of bistable.

      • ~3/15 BS: Yaw offset adjustment by hand. -> 3/5-6

    • 3/5 afternoon or 3/6 morning: Coolers for ITMs will be stopped for 2-3 hours to change water.

    • 3/18-19: Re-alignment
    • 3/19: Closing
    • 3/20: pump down
  • Yend
    • 1/25-2/20: Yend Pcal finalization

    • 3/5: EYA remaining works by Enomoto, Inoue.

    • 2/25-3/4: Yend WAB finalization

      • 3/5: AOS EY and EX(if they have time) work.

    • 3/6: Y end closing (no laser hazard at least in the morning)

    • 3/7: Y end pump down
      • 3/7,8: leak test
  • Xend
    • 2/11-2/14: Xend NAB installation

    • 2/21: Removing FC, Payload release

      • 2/27: ETMX release

    • 2/23-3/6: Xend Pcal finalization 1

      • Periscope installation

      • 3/6: Beam position by IR and Green

    • 3/5 AOS: EY and EX(if they have time) work.

    • 3/6: Green X alignment (no IR), and no hazard at Y end.

    • 3/11, 18,19: Xend WAB finalization.
    • ~3/15: ETMX tuning.
    • 3/19: Heatlink etc.
    • 3/19: ETMX finalization by Takahashi
    • 3/18,19: ETMX alignement
    • 3/21 closing
    • 3/22 Pumping down
      • Leak test
  • 3/18~ : Night work starts, daily meeting will be moved to 1PM
    • Summary of work will last for a while in the morning meeting.
  • 2/18-3/22(?postponed): DRMI commissioning
  • 3/25-4/19: Y arm commissioning
  • 3/25-4/19: FPMI commissioning

Note

Weekend

Report of work

  • Pump down for central area was postponed for 2 weeks.
  • Type B: BS still has some trouble, it was decided to open chamber again.
  • Type Bp: OSEMs were fixed, and it looks OK. Beam position on QPD was off. PRM needs more tuning and measurement. It will be done in the next week.
  • Y end temperature became low by 3 degree.
  • IOO: Found touching AOM driver and fork, and it was making a big group loop. Once it was released the noise became much smaller.

Work plan

  • Yend pump down start today.

KAGRA/Commissioning/DailyWork/2019-03-07 (last edited 2019-03-07 09:45:49 by OsamuMiyakawa)