Differences between revisions 1 and 2
Revision 1 as of 2019-05-29 12:59:05
Size: 1511
Comment:
Revision 2 as of 2019-05-29 13:08:45
Size: 1711
Comment:
Deletions are marked like this. Additions are marked like this.
Line 43: Line 43:
   * TYPE A: Measurement of TF for Type A is going on from this morning.
Line 48: Line 49:
 * IOO: Laser safety button will be available this afternoon.
 * VIS: Status monitor for VIS will show up in the control room.

2019/5/29(Wed.)

Schedule

  • 5/22-23: MZ release from PSL

  • 5/20-24: Exchanging cryo valves.

  • 5/27-6/2: Y arm mass lock.
  • 5/29: RT PC maintenance -> go to safe mode for all VIS connected Dolphin (specially BS)

  • 6/3-6/14: Installation of TMS for ETMY
  • 6/8: Engineering run
  • ITMX
    • 5/22AM~: tuned off cryostat cooler, finesse measurement for Xarm

    • 5/22AM~: tuned off shield cooler, finesse measurement for Xarm

  • ETMX
    • 5/2: Cooling start

  • ITMY
    • 5/23AM~: tuned off cryostat cooler, finesse measurement for Yarm

  • ETMY
    • 5/17~: tuned off ETMY cryostat cooler

  • Long term:
    • 4/22-5/31: Yarm commissioning
    • 5/27-6/30: DRMI commissioning
    • 7/1-8/9: DRFPMI commissioning
    • 8/12-10/4: DRFPMI ASC
    • 10/7-11/15: Post Commissioning
    • 11/18-12/13: Noise hunting

Note

Night work

Weekend

Report of work

  • COM: GR for X arm was locked again. The problem was that the shutter of GR was half closed since last Wednesday.
    • Some resonances of 3.6H and 5.1Hz were excited when length control signal was injected to hierarchy control point.
  • CRY: ITMY reached 29K.
  • TYPE A: Measurement of TF for Type A is going on from this morning.

Work plan

  • DGS: Maintenance for replacing k1lsc0.
  • COM: Finesse measurement for y arm with low temperature. Contamination can happen with low temperature.
  • Type B: Smooth watch dog will be implemented into some Type Bs in the maintenance time.
  • IOO: Laser safety button will be available this afternoon.
  • VIS: Status monitor for VIS will show up in the control room.

KAGRA/Commissioning/DailyWork/2019-05-29 (last edited 2019-05-29 13:08:45 by OsamuMiyakawa)