Line 1: Line 1:
=== 2019/7/22(Wed.) === === 2019/7/22(Mon.) ===

2019/7/22(Mon.)

Schedule

  • ~7/31: Trial for DRMI with polarization.
  • 7/6~: Trial for mass lock
  • ITMX
  • ETMX
  • ITMY
  • ETMY
  • Long term:
    • 7/1-8/9: FPMI/DRFPMI commissioning
    • 8/12-10/4: ASC
    • 10/7-11/15: Post Commissioning
    • 11/18-12/13: Noise hunting

Note

  • We have 1pm meeting more seriously. It will discuss next 24 house commissioning plan.
  • Please write down klog when your work is done and if you will have something to be announced.

Night work

Weekend

Report of work

  • IOO: Demodulator for iMC was exchanged as a part of CALM loop (Enomoto).
  • A new IFO configuration was implemented.

Work plan

  • SR3 needs some work for noise hunting.
  • OMC work.