Size: 729
Comment:
|
Size: 905
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
*Topics | *Topics on the sensitivity enhancement |
Line 10: | Line 10: |
*WFS to mitigate the contrast fluctuation | *ADS/ASC/WFS for arms to mitigate the contrast fluctuation |
Line 12: | Line 12: |
*More dynamic range of PNC? | *More dynamic range of PNC-X? |
Line 27: | Line 27: |
*Topics on maintenance for the long operation *Vacuum stuff *Cryo-coolers *Air conditioning Coolers/heaters |
Commissioning Strategy Meeting (2023/2/17)
- Topics on the sensitivity enhancement
- Seismic noise isolation of OMC?? (~ 6 months??)
- 3 mirror cooling(~2 months)
- Control of PRFPMI+DC
- ADS/ASC/WFS for arms to mitigate the contrast fluctuation
- Enhance OMC lock-acquire stability?
- More dynamic range of PNC-X?
- Laser
- HPL usage for IFO (120W to Toyama U, Characterized New 60W to KAGRA)
HPL in Toyama U (new 60W characterization -> KAGRA, Repair of 120W from KAGRA)
- ISS
- Noise hunting and reduction
- MICH
- PRCL
- Suspension control around 100Hz for some suspensions
- Suspension control around the micro-seismic area
- MISC
- Remove unnecessary stuff from the isolated area, especially around OMC.
*Topics on maintenance for the long operation
- Vacuum stuff
- Cryo-coolers
- Air conditioning Coolers/heaters