Differences between revisions 29 and 30
Revision 29 as of 2023-02-17 15:19:28
Size: 4177
Editor: miyoki
Comment:
Revision 30 as of 2023-02-17 15:30:37
Size: 4302
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 38: Line 38:
    *
Line 41: Line 42:
    *Seismic noise comparison?
Line 88: Line 90:
   *Whitening filter apply
   *REFL power up
Line 97: Line 102:
   *TakahashiR-san maybe.    *TakahashiR-san maybe. + Takahashi-san, Yasui-san
Line 101: Line 106:
  *Air conditioning Coolers/heaters   *Air conditioning Coolers/heaters -. Miyoki

Commissioning Strategy Meeting (2023/2/17)


  • 3 months + 1 week to O4a start (24 May)
    • Golden Week holidays(3-7 May)
    • GWADW2023 (21-27 May)
  • Daily commissioning strategy is necessary!
    • More precise time sharing and assignments are necessary.
    • Can we work in KAGRA from am 5:00 ?? -> Consult with Ohashi-san

    • How much late is allowed in the night?? -> Consult with Ohashi-san

  • Topics on the sensitivity enhancement
    • Seismic noise isolation of OMC?? (~ 6 months??)
      • where is the noise due to the "normally expected" seismic noise?
      • Some selection
        • no opening vacuum tanks <- low seismic noise environment to realize 1-3Mpc

        • opening vacuum tanks <- if scattered light ? new injection path is also possible.

      • TMPs were off on OMC/SRM at present.
      • Seismic noise is still larger than O3GK now.
      • Can we reach the O3GK sensitivity level if we can realize the low seismic noise level? -> Washimi-kun -> We can reduce or not

      • If we open OMC, what should we check?
        • scattered light on the cable? that was identified by Akutsu-kun.
        • Bleade spring resonance? No data.
        • Up conversion noise implies scattered light noise?
          • OSTM swing to check the scattered lights? -> Ushiba

          • Slow actuation of suspension -> PEM team

          • Hummering/acoustic test?
      • stable noises also exist.
    • 3 mirrors(IX, IY, EY) cooling(~2 months(assuming "1 month for one mirror" and "one cooling in one arm at the same time".)
      • How much commissioning time will be used for
        • suspension height adjustment
        • drifting
        • PY/L coupling adjustment
        • resonance mitigation control in -> minor adjustment is enough, mainly in gain.

      • What is the milestone
      • Cryocooler effects is serious or not? According to Yamada-kun's thesis, no effect for the designed sensitivity.
        • We can check by just operating motors.
        • We get peak noises nad enhanced noises for the frequency range of 10~100Hz.
        • Seismic noise comparison?
      • Can we cool during O?
    • Control of PRFPMI+DC
      • ADS/ASC/WFS for arms to mitigate the contrast fluctuation -> Ushiba

        • mysterious off set problems
        • under investigation.
        • Check the TMSX to kill scattered light.
        • ETMY covering -> check effect

        • ADS in FPMI
      • Enhance OMC lock-acquire stability?
        • more guardian improvement(Ushiba, Aso)
      • More dynamic range of PNC-X?
    • Laser
      • HPL usage for IFO (120W to Toyama U, Characterized New 60W to KAGRA)
        • After noise-hunting
      • HPL in Toyama U (new 60W characterization -> KAGRA, Repair of 120W from KAGRA)

        • Laser power increase strategy -> Arm cavity instability mainly of Pitch.

          • Many measures were prepared. So this pitch can be suppressed. Not so serious.
      • What is the milestone to change HPL
        • 1Mpc ?
        • noise budgeting?
        • PLL adjustment is bothering us!!
      • ISS
        • below 3Mpc line. However, bad alignment will produce a line noise.
    • Noise hunting, reduction, budgeting
      • MICH
        • noise budgeting is important.
      • PRCL
        • noise budgeting is important.
      • Suspension control around <100Hz for some suspensions

      • Suspension control around the micro-seismic area
        • try the bottom filter dumper sensor correction in L
        • Terrence method trial in future
      • PEM/DetChar activities
      • Whitening filter apply
      • REFL power up
    • MISC
      • Remove unnecessary stuff from the isolated area, especially around OMC. -> Miyoki

      • OMC: some cabling should be reset. -> Miyoki

      • Environment cleaning. -> Miyoki

  • Topics on maintenance for the long operation
    • Vacuum stuff
      • Ion pump operation estimation -> Who (Kimura, next week) -> Next week schedule.

      • -> do as soon as possible.

      • TakahashiR-san maybe. + Takahashi-san, Yasui-san
    • Cryo-coolers
    • Air conditioning Coolers/heaters -. Miyoki
    • Seasonal water drainage
      • Yarm pumping mid March - mid May

KAGRA/Commissioning/Meetings/Others/StrategyMeeting (last edited 2023-02-17 15:30:37 by miyoki)