Line 5: Line 5:
  *Seismic noise isolation   *Seismic noise isolation of OMC
Line 7: Line 7:
  *3 mirror coolings   *3 mirror cooling

  *Noise hunting
   *MICH
   *PRCL
   *Suspension
   *HPL
   *ISS

  *MISC
   *Remove unnecessary stuff from the isolated area, especially around OMC.

Commissioning Strategy Meeting


  • Topics
    • Seismic noise isolation of OMC
    • 3 mirror cooling
    • Noise hunting
      • MICH
      • PRCL
      • Suspension
      • HPL
      • ISS
    • MISC
      • Remove unnecessary stuff from the isolated area, especially around OMC.