Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2018-05-22 10:16:59
Size: 607
Comment:
Revision 5 as of 2018-05-22 11:33:04
Size: 960
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 * Attendance: Miyakawa,
  * eZuce: Hirose, Izumi, Ushiba
 * Attendance: Miyakawa, Uchiyama, Stefan, Mio, Yokozawa
  * eZuce: Izumi, Eleonora, Shoda, Mateo, Hirose, Ushiba, Enomoto
Line 21: Line 21:
  * X arm item list and schedule
   * Item list, what is prepwhen, who
   * Schedule for preparation.
   * Schedule for commissioning
    * Mateo, Eleonora
  * X arm
    * Item list, what is prepared. when, who
    * Schedule for preparation.
    * Schedule for commissioning.
   * ITMX
    * Status.
   * ETMX
    * measurement for room temp. ~6/14, Cooled ~August
    * How much angle fluctuation is acceptable?
    * Oplev legs should be more stable ones.
Line 26: Line 33:
== 3. mailing list ==

 * Shall we reset all the registers address?

== 4. Meeting ==
Line 29: Line 41:
 * Next meeting: 5/15.  * Next meeting: 5/29.

Minute of KAGRA commissioning meeting


  • Date: 2018/5/22 11AM~12PM
  • Attendance: Miyakawa, Uchiyama, Stefan, Mio, Yokozawa
    • eZuce: Izumi, Eleonora, Shoda, Mateo, Hirose, Ushiba, Enomoto


  • 5/28 10AM~ Extended chief meeting at Toyama Univ.

1. Stages in phase 2

2. Phase 2

  • What we need;
    • IOO
      • Schedule
      • Human resources
        • Mateo, Eleonora
    • X arm
      • Item list, what is prepared. when, who
      • Schedule for preparation.
      • Schedule for commissioning.
      • ITMX
        • Status.
      • ETMX
        • measurement for room temp. ~6/14, Cooled ~August
        • How much angle fluctuation is acceptable?
        • Oplev legs should be more stable ones.

3. mailing list

  • Shall we reset all the registers address?

4. Meeting

Others

  • Next meeting: 5/29.

KAGRA/Commissioning/Weekly/20180522/Minute (last edited 2018-05-22 12:08:08 by OsamuMiyakawa)