Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
* Attendance: Miyakawa, * eZuce: Hirose, Izumi, Ushiba |
* Attendance: Miyakawa, Uchiyama, Stefan, Mio, Yokozawa * eZuce: Izumi, Eleonora, Shoda, Mateo, Hirose, Ushiba, Enomoto |
Line 21: | Line 21: |
* X arm item list and schedule * Item list, what is prepwhen, who * Schedule for preparation. * Schedule for commissioning |
* Mateo, Eleonora * X arm * Item list, what is prepared. when, who * Schedule for preparation. * Schedule for commissioning. * ITMX * Status. * ETMX * measurement for room temp. ~6/14, Cooled ~end of August * How much angle fluctuation is acceptable? * Oplev legs should be more stable ones. |
Line 26: | Line 33: |
== 3. mailing list == * Shall we reset all the registers address? == 4. Meeting == |
|
Line 29: | Line 41: |
* Next meeting: 5/15. | * Next meeting: 5/29. |
Minute of KAGRA commissioning meeting
- Date: 2018/5/22 11AM~12PM
- Attendance: Miyakawa, Uchiyama, Stefan, Mio, Yokozawa
- eZuce: Izumi, Eleonora, Shoda, Mateo, Hirose, Ushiba, Enomoto
- 5/28 10AM~ Extended chief meeting at Toyama Univ.
1. Stages in phase 2
2. Phase 2
- What we need;
- IOO
- Schedule
- Human resources
- Mateo, Eleonora
- X arm
- Item list, what is prepared. when, who
- Schedule for preparation.
- Schedule for commissioning.
- ITMX
- Status.
- ETMX
- measurement for room temp. ~6/14, Cooled ~end of August
- How much angle fluctuation is acceptable?
- Oplev legs should be more stable ones.
- IOO
3. mailing list
- Shall we reset all the registers address?
4. Meeting
Others
- Next meeting: 5/29.