Line 5: Line 5:
 * Attendance: Miyakawa, Uchiyama, Stefan
  * eZuce: Izumi, Eleonora, Shoda
 * Attendance: Miyakawa, Uchiyama, Stefan, Mio, Yokozawa
  * eZuce: Izumi, Eleonora, Shoda, Mateo, Hirose, Ushiba, Enomoto
Line 21: Line 21:
    * Mateo, Eleonora
Line 22: Line 23:
    * Item list, what is prepwhen, who     * Item list, what is prepared. when, who
Line 30: Line 31:
    * Oplev legs should be more stable ones.

Minute of KAGRA commissioning meeting


  • Date: 2018/5/22 11AM~12PM
  • Attendance: Miyakawa, Uchiyama, Stefan, Mio, Yokozawa
    • eZuce: Izumi, Eleonora, Shoda, Mateo, Hirose, Ushiba, Enomoto


  • 5/28 10AM~ Extended chief meeting at Toyama Univ.

1. Stages in phase 2

2. Phase 2

  • What we need;
    • IOO
      • Schedule
      • Human resources
        • Mateo, Eleonora
    • X arm
      • Item list, what is prepared. when, who
      • Schedule for preparation.
      • Schedule for commissioning.
      • ITMX
        • Status.
      • ETMX
        • measurement for room temp. ~6/14, Cooled ~August
        • How much angle fluctuation is acceptable?
        • Oplev legs should be more stable ones.

3. mailing list

  • Shall we reset all the registers address?

4. Meeting

Others

  • Next meeting: 5/29.