Minute of KAGRA commissioning meeting


  • Date: 2018/5/22 11AM~12PM
  • Attendance: Miyakawa, Uchiyama, Stefan, Mio, Yokozawa
    • eZuce: Izumi, Eleonora, Shoda, Mateo, Hirose, Ushiba, Enomoto


  • 5/28 10AM~ Extended chief meeting at Toyama Univ.

1. Stages in phase 2

2. Phase 2

  • What we need;
    • IOO
      • Schedule
      • Human resources
        • Mateo, Eleonora
    • X arm
      • Item list, what is prepared. when, who
      • Schedule for preparation.
      • Schedule for commissioning.
      • ITMX
        • Status.
      • ETMX
        • measurement for room temp. ~6/14, Cooled ~end of August
        • How much angle fluctuation is acceptable?
        • Oplev legs should be more stable ones.

3. mailing list

  • Shall we reset all the registers address?
    • We will keep the registers members for a while, for example the end of Phase 2.

4. Meeting

  • Once commissioning is going on, we should talk more detail commissioning things.

Others

  • Next meeting: 5/29.