2018/11/6 Commissioning meeting topics
- Assignment of staffs for night work
- Readiness for the X arm commissioning.
- Every Wednesday morning: Maintenance
- 11/5-end of Nov.: Route to IYA is closed.
- 11/16: AM or PM for 30min : Inspection for ETMX cleaning
- 11/26~12/9 Daytime: Y arm alignment from BS to ETMY: Enomoto, Miyazaki, Yokogawa, Sugimoto
- Needs help for Y arm alignment
- 12/10 or 11: ETMX cleaning
- X arm lock
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6796: The noise of PLLX
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6804: PLL feedback spectrum with and without KOACH
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6818: freerun frequency noise of the PROMETHEUS laser.
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6850: freerun frequency noise of the PROMETHEUS laser.
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6803: PR3 needs to be looked
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6810: PR3 needs to be looked
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6831: PR3 needs to be looked
- ETMX and ITMX
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6830: sensing and driving matrix
- Laser, PSL, IOO report
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6824: PMC temerature loop
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6830: modulation index
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6856: Lock-loss investigation of the IMC
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6737: Lock Lose Analysis
- OMC installation
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6846: locking OMC
- CAL
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6843: calibration line injection test
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6848: calibration line injection test
- DGS
- Scheduling for maintenance time on Wednesday morning.
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6768: picomotor