Differences between revisions 1 and 6 (spanning 5 versions)
Revision 1 as of 2018-11-05 11:21:43
Size: 1389
Comment:
Revision 6 as of 2018-11-06 12:16:17
Size: 2139
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
 * 11/5-end of Nov.: IYA root will be closed.
 * 11/6: AM or PM for 30min : Inspection for ETMX cleaning
 * Every Wednesday morning: Maintenance
 * 11/5-end of Nov.: Route to IYA is closed.
 * 11/16: AM or PM for 30min : Inspection for ETMX cleaning
 * 11/26~12/9 Daytime: Y arm alignment from BS to ETMY: Enomoto, Miyazaki, Yokogawa, Sugimoto
  * Needs help for Y arm alignment
Line 13: Line 16:
 * MZ work needs stopping IR in the daytime; ~10/31 ok, 11/1~11/31?
 * Assignment of tuning for suspensions.
Line 18: Line 19:
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6697]]: OLTF
Line 20: Line 20:
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6796]]: The noise of PLLX
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6804]]: PLL feedback spectrum with and without KOACH
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6818]]: freerun frequency noise of the PROMETHEUS laser.
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6850]]: freerun frequency noise of the PROMETHEUS laser.
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6803]]: PR3 needs to be looked
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6810]]: PR3 needs to be looked
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6831]]: PR3 needs to be looked
Line 21: Line 28:

 * ETMX
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6752]]: damping loop engaged
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6725]]: ETMX TM H2 coil dones not respond
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6731]]: Broken magnet?
   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6741]]: Image of ETMX
   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6742]]: Image of ETMX
   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6749]]: Image of ETMX
 * ETMX and ITMX
   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6830]]: sensing and driving matrix
Line 32: Line 33:
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6743]]: Broken AOM?
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6734]]: ISS loop
   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6824]]: PMC temerature loop
   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6830]]: modulation index
   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6856]]: Lock-loss investigation of the IMC
   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6737]]: Lock Lose Analysis
Line 36: Line 39:
   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6846]]: locking OMC

 * CAL
   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6843]]: calibration line injection test
   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6848]]: calibration line injection test
Line 39: Line 47:
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6732]]: picomotor   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6771]]: Off load
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6768
]]: picomotor

2018/11/6 Commissioning meeting topics


  • Every Wednesday morning: Maintenance
  • 11/5-end of Nov.: Route to IYA is closed.
  • 11/16: AM or PM for 30min : Inspection for ETMX cleaning
  • 11/26~12/9 Daytime: Y arm alignment from BS to ETMY: Enomoto, Miyazaki, Yokogawa, Sugimoto
    • Needs help for Y arm alignment
  • 12/10 or 11: ETMX cleaning


KAGRA/Commissioning/Weekly/20181105/Agenda (last edited 2018-11-06 12:16:17 by OsamuMiyakawa)