Line 19: | Line 19: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6796]]: The noise of PLLX * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6818]]: freerun frequency noise of the PROMETHEUS laser. * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6803]]: PR3 needs to be looked * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6810]]: PR3 needs to be looked |
|
Line 21: | Line 26: |
* ETMX * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6752]]: damping loop engaged * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6725]]: ETMX TM H2 coil dones not respond * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6731]]: Broken magnet? * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6741]]: Image of ETMX * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6742]]: Image of ETMX * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6749]]: Image of ETMX |
* ETMX and ITMX * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6830]]: sensing and driving matrix |
Line 34: | Line 31: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6743]]: Broken AOM? * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6734]]: ISS loop |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6824]]: PMC temerature loop * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6830]]: modulation index |
Line 46: | Line 43: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6732]]: picomotor | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6771]]: Off load * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6768]]: picomotor |
2018/11/6 Commissioning meeting topics
- Assignment of staffs for night work
- Readiness for the X arm commissioning.
- Every Wednesday morning: Maintenance
- 11/5-end of Nov.: Route to IYA is closed.
- 11/6: AM or PM for 30min : Inspection for ETMX cleaning
- 11/26~12/9 Daytime: Y arm alignment from BS to ETMY: Enomoto, Miyazaki, Yokogawa, Sugimoto
- Needs help for Y arm alignment
- 12/10 or 11: ETMX cleaning
- X arm lock
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6796: The noise of PLLX
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6818: freerun frequency noise of the PROMETHEUS laser.
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6803: PR3 needs to be looked
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6810: PR3 needs to be looked
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6831: PR3 needs to be looked
- ETMX and ITMX
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6830: sensing and driving matrix
- Laser, PSL, IOO report
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6824: PMC temerature loop
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6830: modulation index
- OMC installation
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6846: locking OMC
- CAL
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6843: calibration line injection test
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6848: calibration line injection test
- DGS
- Scheduling for maintenance time on Wednesday morning.
http://klog.icrr.u-tokyo.ac.jp/osl/?r=6768: picomotor