Minute of KAGRA commissioning meeting


  • Date: 2019/4/23 11:00AM~11:40AM
  • Attendance: Miyakawa, Kozakai, Terrence, Lucia, Okutomi, Yamamoto, Yamada, Enomoto, Aso, Washima, Yokozawa
  • Zoom: Shoda, Takahashi, Izumi, Sawada


Summary of this week

  • Y arm was locked with IR by frequency feedback.
  • The frequency fluctuation of IR was too much for the mass lock, so IR frequency should be stabilized by X arm.
  • X arm and Y arm were aligned and resonate at at time. Beam position at ITMY was too high(1-2cm), and beam position at ITMX was too low(~1cm).

Discussion

  • What is the configuration for FPMI?
    • Locked Fabry-Perot?
  • Engineering run should not fix the configuration to FPMI. Configuration should be flexible. We assume June run as proposed.


Others

  • Next meeting: 5/14.