Line 10: Line 10:
 * Xend
  * --(5/2: Cooling start)--
  * 5/29 cooling will be done.

 * 5/12-13: Height adjustment for ITMX and ITMY.
 * 5/14: RT PC maintenance -> go to safe mode for all VIS connected Dolphin (BS, )
 * ~5/17: Y arm lock trial.
Line 12: Line 19:

 * Center
  * --(4/12: Pump down)--
  * --(4/29,30: Leak check)--
  * --(~5/3: Vent and pumpdown)--
  * --(5/9: leak check)--

 * ITMX:
  * --(4/2~: closing chamber and start pumping down.)--
  * --(4/10: Cooling starts.)--
  * --(5/8: Cooling done)--

 * Xend
  * --(4/25: Pumpdown)--
  * --(5/2: leak check)--
  * --(5/2: Cooling start)--

 * Yend
  * --(4/4~: closing chamber and start pumping down.)--
  * --(4/10: Cooling starts.)--
  * --(5/8: Cooling done)--

 * April: Measurement of TF, payload diagonalization on ITMX
 * End of April~: Y arm commissioning
 * ~End of May (might be delayed to middle of June?): FPMI commissioning
 * ~End of May (might be delayed to middle of June?): Y arm, FPMI commissioning
  * Measurement of TF, payload diagonalization on ITMX

2019/5/14 Weekly commissioning meeting topics


Schedule

  • Xend
    • 5/2: Cooling start

    • 5/29 cooling will be done.
  • 5/12-13: Height adjustment for ITMX and ITMY.
  • 5/14: RT PC maintenance -> go to safe mode for all VIS connected Dolphin (BS, )

  • ~5/17: Y arm lock trial.
  • 5/20-24: Exchanging cryo valves.
  • ~End of May (might be delayed to middle of June?): Y arm, FPMI commissioning
    • Measurement of TF, payload diagonalization on ITMX


Discussion

  • Strategy for height difference between ITMX and ITMY.
  • Status of Y arm lock trial.


KAGRA/Commissioning/Weekly/20190514/Agenda (last edited 2019-05-14 10:57:36 by OsamuMiyakawa)