Differences between revisions 1 and 23 (spanning 22 versions)
Revision 1 as of 2019-12-09 00:42:13
Size: 619
Comment:
Revision 23 as of 2019-12-17 09:57:53
Size: 1262
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
 * Time :''' From 2019/Dec/17(09:00) to 2019/Dec/24(09:00)''' ----
=== For shifts ===
 * [[KAGRA/EngineeringRun/ER191217_24/Shift|Collaborator shift manuals]]

----

* Time :''' From 2019/Dec/17(17:00) to 2019/Dec/24(09:00)'''
Line 5: Line 11:
 * Rough Schedule

 || Dec/10-16(09:00) || Commissioning and preparation ||
 || Dec/16(Mon,09:00)~17/(Tue,17:00) || Concentrate longer stable operation of FPMI ||
 || Dec/17(Tue, 17:00) || start ||
 || Dec/24(Tue, 09:00) || end ||
 || Dec/24(Tue, 09:00 ~ (17:00) ) || proposed post ER tasks ||
Line 6: Line 20:
  * [[ |MIF]]   * [[KAGRA/EngineeringRun/ER191217_24/IFO|IFO(IOO, MIF.LAS)]]
Line 8: Line 22:
  * [[ |PEM]]   * [[KAGRA/EngineeringRun/ER191217_24/PEM|PEM]]
Line 11: Line 25:
  * [[ |DetChar]]
  * [[ |VIS]]
  * [[KAGRA/EngineeringRun/ER191217_24/DetChar|DetChar]]
  * [[KAGRA/EngineeringRun/ER191217_24/VIS|VIS]]
Line 15: Line 29:
  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/EngineeringRun/ER191217_23/FCL|FCL]]   * [[JGWwiki/KAGRA/EngineeringRun/ER191217_24/FCL|FCL]]
Line 17: Line 31:
  * [[ |Special for LV ? ]]   * [[KAGRA/EngineeringRun/ER191217_24/forLV |Special for LV and O3]]
  * [[KAGRA/EngineeringRun/ER191217_24/postERtrial| Post ER trial plans]]
Line 19: Line 34:
 * [[ |Shift]]

ER191217~191224


For shifts


KAGRA/EngineeringRun/ER191217_24 (last edited 2019-12-25 13:05:23 by miyoki)