Differences between revisions 11 and 27 (spanning 16 versions)
Revision 11 as of 2019-12-10 14:40:53
Size: 1109
Editor: miyoki
Comment:
Revision 27 as of 2019-12-25 13:05:23
Size: 1293
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 * Schedule
 || Dec/10-16 (commissioning and preparation) || Dec/17 tune FPMI for longer operation || Dec/17(AM 9) start ||
 * Rough Schedule

 || Dec/10-16(09:00) || Commissioning and preparation ||
 || Dec/16(Mon,09:00)~17/(Tue,17:00) || Concentrate longer stable operation of FPMI ||
 || Dec/17(Tue, 17:00) || start ||
 || Dec/24(Tue, 09:00) || end ||
 || Dec/24(Tue, 09:00 ~ (17:00) ) || proposed post ER tasks ||

----
=== For shifts ===
 * [[KAGRA/EngineeringRun/ER191217_24/Shift|Collaborator shift manuals]]

----

Line 9: Line 22:
  * [[ |IFO(IOO, MIF.LAS)]]   * [[KAGRA/EngineeringRun/ER191217_24/IFO|IFO(IOO, MIF.LAS)]]
Line 11: Line 24:
  * [[ http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/EngineeringRun/ER191217_24/PEM|PEM]]   * [[KAGRA/EngineeringRun/ER191217_24/PEM|PEM]]
Line 14: Line 27:
  * [[ |DetChar]]
  * [[ |VIS]]
  * [[KAGRA/EngineeringRun/ER191217_24/DetChar|DetChar]]
  * [[KAGRA/EngineeringRun/ER191217_24/VIS|VIS]]
Line 17: Line 30:
  * [[ |CRY]]
  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/EngineeringRun/ER191217_24/FCL|FCL]]
  * [[KAGRA/EngineeringRun/ER191217_24/CRY|CRY]]
  * [[KAGRA/EngineeringRun/ER191217_24/FCL|FCL]]
Line 20: Line 33:
  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/EngineeringRun/ER191217_24/forLV |Special for LV ]]
  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/EngineeringRun/ER191217_24/postERtrial| Post ER trial plans]]
  * [[KAGRA/EngineeringRun/ER191217_24/forLV |Special for LV and O3]]
  * [[KAGRA/EngineeringRun/ER191217_24/postERtrial| Post ER trial plans]]
Line 23: Line 36:
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/EngineeringRun/ER191217_24/Shift|Shift]]

ER191217~191224

  • Time : From 2019/Dec/17(17:00) to 2019/Dec/24(09:00)

  • JRPC Discussions on 5th December

  • Rough Schedule

    Dec/10-16(09:00)

    Commissioning and preparation

    Dec/16(Mon,09:00)~17/(Tue,17:00)

    Concentrate longer stable operation of FPMI

    Dec/17(Tue, 17:00)

    start

    Dec/24(Tue, 09:00)

    end

    Dec/24(Tue, 09:00 ~ (17:00) )

    proposed post ER tasks


For shifts


KAGRA/EngineeringRun/ER191217_24 (last edited 2019-12-25 13:05:23 by miyoki)