Differences between revisions 1 and 8 (spanning 7 versions)
Revision 1 as of 2020-02-16 13:52:23
Size: 588
Editor: miyoki
Comment:
Revision 8 as of 2020-02-21 16:08:18
Size: 698
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
 || Feb/21 || CAL Day (09:00 - 21:00)||
 || Feb/22 || ||
 || Feb/23 || ||
 || Feb/24 || ||
Line 11: Line 15:
 || Feb/25(09:00 ~ 11:00 ) || Maintenance ||
 || Feb/25(11:00 ~ ) || Observation ||
 || Feb/25(09:00 ~ 13:00 ) || Maintenance ||
 || Feb/25(17:00 ~ ) || Observation ||
Line 16: Line 20:
 * [[KAGRA/EngineeringRun/ER191217_24/Shift|Collaborator shift manuals]]  * [[KAGRA/EngineeringRun/ER200220_25/Shift|Collaborator shift manuals]]

----

ER200220~200225

  • Time : From 2020/Feb/20(17:00) to 2020/Feb/25(09:00)

  • JRPC Discussions on 20th February

  • Rough Schedule

    Feb/20( ~ 11:00)

    Commissioning and preparation

    Feb/20(11:00)~17:00

    Concentrate longer stable operation of RFPMI

    Feb/20(17:00)

    start

    Feb/21

    CAL Day (09:00 - 21:00)

    Feb/22

    Feb/23

    Feb/24

    Feb/25(09:00)

    end

    Feb/25(09:00 ~ 13:00 )

    Maintenance

    Feb/25(17:00 ~ )

    Observation


For shifts


KAGRA/EngineeringRun/ER200220-25 (last edited 2020-02-23 14:08:49 by miyoki)