Differences between revisions 222 and 291 (spanning 69 versions)
Revision 222 as of 2014-06-12 17:13:47
Size: 24588
Comment:
Revision 291 as of 2014-12-08 12:11:29
Size: 29342
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
----
== 55th(International): Dec. 9, 2014 (Tuesday) 9:00~11:00 (JST) ==
Participants:

Agenda (under planing)

 1. Project report (Kajita)
 1. SEO report (Saito)
 1. Installation of iKAGRA components (Uchiyama)
 1. Reports by IBR members([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3079 |US(Koji Arai)]], [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3081 |SHNU(Xiang-hua Zhai)]]
 1. Necessity of KAGRA Council and rasing candidates of the members (Kuroda)
 1. Intermediate report on authorship policy (Ando/Kuroda)

----
== 54th(in Japanese): Oct. 15, 2014 (Wednesday) 13:00~19:00 ==
Kashiwa campus meeting room: 総合研究棟470号室;IP address for TV conference system:157.82.240.189 SeeVogh is booked as usual.

Participants:

[Kashiwa]Kajita,Tomaru,Tanaka,Miyamoto,Suzuki,Nishiuchi,Chen,Yamamoto,Sakakibara,Kuroda

[SeeVogh]Kanayama,Takahashi(H),Kawabe, Kandalab,Ishizaki,Itoh,Ohishi,Flaminio,Izumi,Hayama,Akutsu,Miyakawa,Yano,Saito(Y),Aso,Kawamura,Tagoshi,Sato(T),Ueno,Takahashi(R),Narikawa,yokoyama,hirose,Saito(T),Kataoka

Agenda

==== General Reports (13:00~15:00) ====
 1. Some thoughts on LIGO progress -[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2847|Koji Arai (40 min)]]
 1. Project Report -[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2854|Kajita (20 min)]]
 1. SE Office general report -[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2856|Saito (20 min)]]
 1. Safety Control -[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2855|Kuroda ( 10 min)]]
 1. Report of CPC -[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2858|Flaminio ( 10 min)]]
 1. Report of PR -[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2849|Aso ( 10 min)]]
 1. Geometry measurement in KAGRA -[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2859|Tomaru( 10 min)]]

==== Subsystem reports I (15:00-15:30) ====
 1. Report of Input/output Optics (30 min)
  ||General report ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2853|S. Kawamura]] ||
  ||Prestabilized laser ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2862|M. Nakano]] ||
  ||Input mode cleaner suspension ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2861|T. Saito]] ||



==== Coffee Break (15:30-15:50) ====
==== Renewal of Project Plan (15:50-16:20) ====
 1. bKAGRA plan with the present budget expectation -[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2852|Y. Aso]] (30 min)

==== Subsystem reports II (16:20~19:00) ====
 1. Report of Detector Characterization (10min)
  ||General report ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2864|K. Hayama]] ||



 1. Report of Vibration Isolation subsystem (10 min)
  ||General report ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2865|R. Takahashi]]||



 1. Report of Cryogenic subsystem (10 min)
  ||General report ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2851|K. Yamamoto]] ||



 1. Installation Scheduling [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2843|Uchiyama(20min)]]
 1. Report of Laser subsystem (15 min)
  ||Present status of the laser system for KAGRA ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2866|Ryota Nishiuchi]] ||



 1. Report of Auxiliary Optics subsystem (10 min)
  ||General report ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2857|Akutsu]] ||



 1. Report of Data Management subsystem (15min)
  ||General report ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2850|N. Kanda]] ||
  ||Topical report ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2848|T. Yamamoto]] ||



 1. Report of Data Analysis subsystem (15min)
  ||General report ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2867|H. Tagoshi]] ||
  ||Topical report ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2863|M. Kaneyama]] ||



 1. Report of DGS & AEL (15min)
  ||General report ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2860|O. Miyakawa]] ||


Line 6: Line 96:
[Kashiwa],・・・

[SeeVogh],・・・

Agenda

 1. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=2466|Project report]] - Kajita 
 1. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=2467|SEO report}} - Saito
[Kashiwa] Kajita, Yamamoto, Kawamura, Kuroda, Miyamaoto, Tanaka, Sakakibara, Yamanaka

[SeeVogh] Saito, Ohashi, Itoh, Hayama, Yuzurihara, Ando, Kanda, Flaminio, Ueno, Aso, Miyakawa(PolyCom)

Agenda

 1. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=2466|Project report]] - Kajita
 1. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2467|SEO report]] - Saito
Line 15: Line 105:
 1. Report of subsystem 2
 1. Others
 1. Report of subsystem 2
 1. Others
Line 25: Line 116:
  ''''''Agenda'''''' Agenda
Line 30: Line 120:
 1. [[attachment:140416 KAGRA Project report.pdf|Project Report]]          -Kajita (20min)   1. [[attachment:140416 KAGRA Project report.pdf|Project Report]]          -Kajita (20min)
Line 33: Line 123:
Coffee Break (14:35-15:00) 

 1. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=2347|Schedule of Installation & Commissioning]]          -Saito (20min) 

 1. Report of each subsystem (a few topics selected by SEO)(70min)  
 [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=2365|What can we do with iKAGRA ?]], Aso
[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=2342|Control System of Interferometer]], Miyakawa, (30min)

Specification of laser(LAS, Suzuki & Mio, 20min)

[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2336|Tunnel structure and status - Tunnel]],[[ http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2341| - FCL]], Uchiyama & Miyoki (20min)


 1. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2364|Status of VIS R&D ]]          -Pena(20min)
Coffee Break (14:35-15:00)

 1. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=2347|Schedule of Installation & Commissioning]]          -Saito (20min)

 1. Report of each subsystem (a few topics selected by SEO)(70min)
 [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=2365|What can we do with iKAGRA ?]], Aso [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=2342|Control System of Interferometer]], Miyakawa, (30min) Specification of laser(LAS, Suzuki & Mio, 20min) [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2336|Tunnel structure and status - Tunnel]],[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2341|- FCL]], Uchiyama & Miyoki (20min)

 1. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2364|Status of VIS R&D]]          -Pena(20min)
Line 65: Line 148:
 1. Report of MIR subsystem by Kyohei Watanabe (CSIRO report)[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2058|[O]]]   1. Report of MIR subsystem by Kyohei Watanabe (CSIRO report)[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2058|[O]]]
Line 85: Line 168:

KAGRA collaboration meeting


55th(International): Dec. 9, 2014 (Tuesday) 9:00~11:00 (JST)

Participants:

Agenda (under planing)

  1. Project report (Kajita)
  2. SEO report (Saito)
  3. Installation of iKAGRA components (Uchiyama)
  4. Reports by IBR members(US(Koji Arai), SHNU(Xiang-hua Zhai)

  5. Necessity of KAGRA Council and rasing candidates of the members (Kuroda)
  6. Intermediate report on authorship policy (Ando/Kuroda)


54th(in Japanese): Oct. 15, 2014 (Wednesday) 13:00~19:00

Kashiwa campus meeting room: 総合研究棟470号室;IP address for TV conference system:157.82.240.189 SeeVogh is booked as usual.

Participants:

[Kashiwa]Kajita,Tomaru,Tanaka,Miyamoto,Suzuki,Nishiuchi,Chen,Yamamoto,Sakakibara,Kuroda

[SeeVogh]Kanayama,Takahashi(H),Kawabe, Kandalab,Ishizaki,Itoh,Ohishi,Flaminio,Izumi,Hayama,Akutsu,Miyakawa,Yano,Saito(Y),Aso,Kawamura,Tagoshi,Sato(T),Ueno,Takahashi(R),Narikawa,yokoyama,hirose,Saito(T),Kataoka

Agenda

General Reports (13:00~15:00)

  1. Some thoughts on LIGO progress -Koji Arai (40 min)

  2. Project Report -Kajita (20 min)

  3. SE Office general report -Saito (20 min)

  4. Safety Control -Kuroda ( 10 min)

  5. Report of CPC -Flaminio ( 10 min)

  6. Report of PR -Aso ( 10 min)

  7. Geometry measurement in KAGRA -Tomaru( 10 min)

Subsystem reports I (15:00-15:30)

  1. Report of Input/output Optics (30 min)

Coffee Break (15:30-15:50)

Renewal of Project Plan (15:50-16:20)

  1. bKAGRA plan with the present budget expectation -Y. Aso (30 min)

Subsystem reports II (16:20~19:00)

  1. Report of Detector Characterization (10min)
  2. Report of Vibration Isolation subsystem (10 min)
  3. Report of Cryogenic subsystem (10 min)
  4. Installation Scheduling Uchiyama(20min)

  5. Report of Laser subsystem (15 min)
  6. Report of Auxiliary Optics subsystem (10 min)
  7. Report of Data Management subsystem (15min)
  8. Report of Data Analysis subsystem (15min)
  9. Report of DGS & AEL (15min)


53rd(International): Jun. 12, 2014 (Thursday) 17:00~19:00 (JST)

Participants:

[Kashiwa] Kajita, Yamamoto, Kawamura, Kuroda, Miyamaoto, Tanaka, Sakakibara, Yamanaka

[SeeVogh] Saito, Ohashi, Itoh, Hayama, Yuzurihara, Ando, Kanda, Flaminio, Ueno, Aso, Miyakawa(PolyCom)

Agenda

  1. Project report - Kajita

  2. SEO report - Saito

  3. Report of subsystem 1
  4. Report of subsystem 2
  5. Others


52th(Domestic): Apr. 16, 2014 (Wed) 13:00~(JST)

In prior to this doestic meeting, we have lectures for new members staring at 10:00 in the morning. The lecturers are Prof. Kentaro Somiya and Prof Yusuke Itoh.

  1. Gravitational-wave detector - Somiya (60 min)

  2. Gravitational-wave data analysis - Itoh (60 min)

Agenda

  1. Random thoughts about aLIGO and installation        -Kawabe (45min)

  2. Introduction of Fresh persons (10min)
  3. Project Report          -Kajita (20min)

  4. SE Office report (report of the external review)          –Ando (20min)

Coffee Break (14:35-15:00)

  1. Schedule of Installation & Commissioning          -Saito (20min)

  2. Report of each subsystem (a few topics selected by SEO)(70min)

    What can we do with iKAGRA ?, Aso Control System of Interferometer, Miyakawa, (30min) Specification of laser(LAS, Suzuki & Mio, 20min) Tunnel structure and status - Tunnel,- FCL, Uchiyama & Miyoki (20min)

  3. Status of VIS R&D          -Pena(20min)

  4. Status of Cryo-suspension          -Yamamoto(20min)

  5. Others (Safety control)          -Kuroda(10min)


51th(International): Dec. 10, 2013 (Tuesday) 9:00~11:00 (JST)

Participants:

[Kashiwa], D. Castellano, D. Chen, K. Hayama, T. Kajita, S. Kawamura, A.Khalaidovski, F. Picariello, I. Pinto, Y. Saito, K. Watanabe, K. Yamamoto

[SeeVogh], T. Akutsu, M. Ando, Y. Aso, O. Miyakawa, S. Miyoki, Y.Sakakibara, K. Somiya, H. Tagoshi, C. Tokoku, T. Uchiyama, H. Yamamoto,T. Yokozawa, H. Yuzurihara

Agenda

  1. Project report by Kajita [O]

  2. Outline of iKAGRA installation by SEO (Saito), which will include task of each SEO member.[O]

  3. Conference reports (Korea-Japan WS by Kawamura [O] and ET+ELiTES meetings by Somiya [o])

  4. Report of MIR subsystem by Kyohei Watanabe (CSIRO report)[O]

  5. Others


50th(Domestic): Oct. 9, 2013 (Wed) 13:00~(JST)

Agenda

  1. News from LIGO (Output Mode Cleaner by K. Arai)

  2. Project report (Kajita)[o]

  3. SE Office report (Saito)[o]

  4. Report of each subsystem (I)
  5. Report of each subsystem (II)
  6. Status and Schedule of Mirror (Hirose)[o]

  7. Test and Schedule of anti-vibration system (Prototype-B) utilizing TAMA facility [o]

  8. Design of Payload and Vertical anti-vibration system
  9. Current status and schedule of cryogenic payload[o]

  10. Others

Files


49th(International): June 19 (Wed) 17:00~(JST)

Participants:(Kashiwa) T.Kajita, S.Kawamura, K.Yamamoto, R.Takahashi, T.Akutsu, Y.Saito, Chen Dan, Y.Itoh, A.Khalaidovski, K.Ono, (SeeVogh) F.E.P.Arellano, K.Somiya, L.Biotti, N.Kanda, R.DeSalvo, S.Miyoki, T.H.Yoon, T.Yokozawa, T.Sekiguchi,T.Suzuki, W.Johnson,Y.Aso, K.Agatsuma,N.Kawai

Agenda

  1. Project report [O] (Kajita)

  2. SE Office report [O] (Somiya)

  3. Plan of Core-to-core program of JSPS [O] (Kawamura)

  4. Conferences and Meeting report [O] (Kuroda)

  5. Report of Subsystems (if needed)
  6. Others

Files


48th(Domestic): Apr. 17, 2013 (Mon) 13:00~(JST)

Agenda

  1. Introduction of fresh members [O](Kuroda)

  2. Project status report [O]((Kajita)

  3. Speech of new project manager and explanation of new organization and meetings (Saito)
  4. SE Office report (mainly on the new budget saving plan) & Management of JSPS core-to-core program [O] [O]((Kawamura)

  5. Installation and Commissioning [O] (Kawamura and Ohashi)

  6. Reports of sub-systems (Each Chief)
  7. Others

Files


Meeting schedule

47th(Domestic): Dec. 17, 2012(Mon) 13:00~(JST)


EVO connection [ help ]

Agenda

  1. Project status report (Kajita) Viewgraph

  2. SE Office report (Kawamura) Viewgraph

  3. Hearing report on financial plan of each subsystem (Ohashi?) Viewgraph

  4. Report of each subsystem
  5. Quartary LIGO request (Kuroda?) Viewgraph

  6. Report of 4th ET symposium (Somiya and Yamamoto)ViewgraphViewgraph

  7. 2nd KAGRA data analysis school in February 2013 (Tagoshi)Viewgraph

  8. After EVO system (Kajita and Aso ?)Viewgraph

  9. others

Files


46th(International): Nov. 6, 2012(Tue) 9:00~(JST)


EVO connection [ help ]

Agenda

  1. Project Status Report (20 minutes including discussion)Viewgraph[O]

  2. SE Office report (30 minutes including discussion)Viewgraph[O]

  3. Start of Kamioka GWPO branch (10 minutes including discussion)Viewgraph[O]

  4. International relations (15 minutes)
    • Collaboration with LSC and Virgo(Kanda and Ando)Viewgraph[O]

    • First ELiTES and Virgo meeting(Kuroda)Viewgraph[O]

  5. Application to ICRR cooperative research (5 minutes) (Kuroda)Viewgraph[O]

  6. Others


45th(Domestic): Oct. 15, 2012(Mon) 13:00~(JST)


EVO connection [ help ]

Agenda

  1. Project Status (Kajita) Viewgraph

  2. SEO (Kawamura) Viewgraph

  3. Status of LIGO (Rana) Viewgraph

  4. 1st Elites meeting report (Somiya) Viewgraph Timetable

  5. Subsystem Report
  6. Application for funding.
  7. Commissioning Plan
  8. others

Files


44th(Domestic): Jul. 9, 2012(Mon) 13:00~(JST)


EVO connection [ help ]

Agenda

  1. Project Status (Kajita) Viewgraph

  2. “Commissioning Issues” (Arai) Viewgraph

  3. Research plan for Grant-in-Aid for Scientific Research (Kanda) Viewgraph

  4. Activity of SE office (Kawamura) Viewgraph

  5. Report of each subsystem (each chief)
  6. Research Collaboration with overseas project (ELiTES, Kuroda) Viewgraph

  7. Report of Workshop at Toyama University (Kawamura) Viewgraph

  8. Agenda of the forthcoming f2f meeting ViewGraph

  9. Program of PAB meeting in August (Kuroda) ViewGraph[X]

  10. Effort to get funds from JSPS ViewGraph[X]

  11. Others

Files


43th(International): May. 29, 2012(Mon) 9:00~(JST)


EVO connection [ help ]

Agenda

  1. Project Report (Kajita) ViewGraph[O]

  2. New Collaboration Members (Kuroda) ViewGraph

  3. Budget report in FY2011 (Ohashi) ViewGraph[O]

  4. SE Office report (Kawamura) ViewGraph[O]

  5. Report by Australian member (Linqing Wen) ViewGraph

  6. Report of Sub-working groups
  7. Presentation policy by CPC ViewGraph

  8. Others

Files

Talk by Dr.Linqing Wen.

  • Title: The scientific benefit of a larger GW detector network
  • Speaker: Linqing Wen (on behalf of the ACIGA collaboration)
  • Abstract: We are at the dawn of making the first detection of gravitational waves (GWs). The advanced LIGO and VIRGO detectors are funded and are under construction with a promise of tens of detections a year. A larger GW network is forming with the KAGRA detector in Japan partially funded and LIGO-India on the near horizon. In this talk, I will show that the GW detector network is approaching the desirable capacity that allows prompt and yet precise follow-up observations of gravitational wave events by conventional electromagnetic telescopes. I will then argue for a larger network that includes AIGO - a GW detector at the southern hemisphere. At the end of my presentation, I'll address briefly the status and future plan for AIGO.


42th(Domestic): Apr. 16, 2012(Mon) 13:00~(JST)


EVO connection [ help ]

Agenda

  1. Introduction of New Commers
  2. Present Status of aLIGO (K.Kawabe)viewgraph

  3. Project Report (T.Kajita) viewgraph

  4. Budget Status (M.Ohashi) viewgraph

  5. KAGRA Science Goal and Data Sharing (N.Kanda) KandaHayama

  6. Schedule and Roadmap (M.Ando) viewgraph

  7. Change of Chart (I.Nakatani) viewgraph

  8. Subgroup progress report by every chief
  9. Preparation for External Review (S. Kawamura) viewgraph

  10. Others (International Conferences in this year)

Files


Past collaboration meeting



LCGT wiki top

KAGRA/Meeting/Collaboration (last edited 2016-11-05 10:38:52 by miyoki)