Differences between revisions 1 and 2
Revision 1 as of 2025-06-03 10:44:09
Size: 1159
Comment:
Revision 2 as of 2025-06-03 10:44:39
Size: 1152
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
  *(2)10-12(or 12):   *(2)10-12:

KAGRA/Observation/O4c/maintenanceについて、ここに記述してください。

*Time

  • 8:00 ~ 12:00 or until the end of CAL just before restarting the observation
  • The max end time: 16:00
  • Contents (SHOULD BE DISCUSSED)
    • (0)8-9: Confirm NO large SNR events in the last night observing run -> If the events exist, stop the following works and have discussions.

    • (1)9-10: CAL for the previous week's observation(CAL-G). The shooting of the mirror height(Yuzurihara). Finesse measurement(Oshino).
    • (2)10-12:
      • Kamioka Mine Company: Tunnel Inspection
      • Kagra site staff: Instrument checks
      • VAC/CRY: Checked by Kimura-san + KAGRA site staff
      • VIS offload if necessary (Takahashi.R)
    • (3)After(2): CAL for the next week's observation.
    • (4)Restart observation after(3)
  • CAL activities (NEED LINK UPDATE)
  • DGS
    • In basic, we don't touch.

KAGRA/Observation/O4c/maintenance (last edited 2025-06-13 14:40:38 by shoichi.oshino)