Size: 1865
Comment:
|
Size: 1886
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 9: | Line 9: |
*(1) 9-11: CAL for the previous week's observation(CAL-G). Regular TCam photo session just after the morning cal measurement, to monitor the latest mirror center position (Yuzurihara). Finesse measurement(Oshino). | *(1) 9-11: CAL for the previous week's observation(CAL-G). Regular TCam photo session just after the morning cal measurement, to monitor the latest mirror center position. It will take ~5 min. (Yuzurihara) Finesse measurement(Oshino). |
*Time and condition
- 9:00 ~ 12:00 or until the end of CAL just before restarting the observation
- The max end time: 16:00
- The blasting for the tunnel construction will not be done from 8:00 to 12:00 every Friday until July 10th (the end day for blasting), according to our negotiation.
- Contents (SHOULD BE DISCUSSED)
(0) 8- 9: Confirm NO large SNR events in the last night observing run -> If the events exist, stop the following works and have discussions.
- (1) 9-11: CAL for the previous week's observation(CAL-G). Regular TCam photo session just after the morning cal measurement, to monitor the latest mirror center position. It will take ~5 min. (Yuzurihara) Finesse measurement(Oshino).
- (2)11-12:
- Kagra site staff: Instrument checks (Please call Hayakawa-kun to allow the activities in the KAGRA site. If during his absence, please call Takahashi(masa)-san, or Sawada-san or Yamaguchi-san, in this order.)
- Hayakawa-kun or the technical staff will call the control room if the activities are finished.
- VAC/CRY: Checked by Kimura-san + KAGRA site staff.
- VIS offload if necessary (Takahashi.R)
- Kagra site staff: Instrument checks (Please call Hayakawa-kun to allow the activities in the KAGRA site. If during his absence, please call Takahashi(masa)-san, or Sawada-san or Yamaguchi-san, in this order.)
- (3)13-14:
- Kamioka Mine Company: Tunnel Inspection.(If more IFO/CAL/Detchar, etc., works are necessary, this inspection will be canceled.)
- Hayakawa-kun or the technical staff will call the control room if the activities are finished.
- VAC/CRY: Checked by Kimura-san + KAGRA site staff.
- Kamioka Mine Company: Tunnel Inspection.(If more IFO/CAL/Detchar, etc., works are necessary, this inspection will be canceled.)
- (4)After(3): CAL for the next week's observation.
- (5)Restart observation after(3)
- CAL activities (NEED LINK UPDATE)
Measurement items: JGW-L2314903
Weekly change in SDF: JGW-L2314962
- DGS
- In basic, we don't touch.