Size: 1064
Comment:
|
Size: 1075
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
*Kamioka Mine Company: Tunnel Inspection | |
Line 14: | Line 13: |
*(3)After(2): CAL for the next week's observation. *(4)Restart observation after(3) |
*(3)13-14: Kamioka Mine Company: Tunnel Inspection *(4)After(3): CAL for the next week's observation. *(5)Restart observation after(3) |
*Time
- 9:00 ~ 12:00 or until the end of CAL just before restarting the observation
- The max end time: 16:00
- Contents (SHOULD BE DISCUSSED)
(0)8-9: Confirm NO large SNR events in the last night observing run -> If the events exist, stop the following works and have discussions.
- (1)9-10: CAL for the previous week's observation(CAL-G). The shooting of the mirror height(Yuzurihara). Finesse measurement(Oshino).
- (2)10-12:
- Kagra site staff: Instrument checks
- VAC/CRY: Checked by Kimura-san + KAGRA site staff
- VIS offload if necessary (Takahashi.R)
- (3)13-14: Kamioka Mine Company: Tunnel Inspection
- (4)After(3): CAL for the next week's observation.
- (5)Restart observation after(3)
- CAL activities (NEED LINK UPDATE)
Measurement items: JGW-L2314903
Weekly change in SDF: JGW-L2314962
- DGS
- In basic, we don't touch.