Line 10: Line 10:
   *Kagra site staff: Instrument checks
   *VAC/CRY: Checked by Kimura-san + KAGRA site staff
   *Kagra site staff: Instrument checks (Please call Hayakawa-kun to allow the activities in the KAGRA site. If during his absence, please call Takahashi(masa)-san, or Sawada-san or Yamaguchi-san, in this order.)
    *Hayakawa-kun or the technical staff will call the control room if the activities are finished.
   *VAC/CRY: Checked by Kimura-san + KAGRA site staff.
Line 13: Line 14:
  *(3)13-14: Kamioka Mine Company: Tunnel Inspection   *(3)13-14: Kamioka Mine Company: Tunnel Inspection.
   *VAC/CRY: Checked by Kimura-san + KAGRA site staff.

*Time

  • 9:00 ~ 12:00 or until the end of CAL just before restarting the observation
  • The max end time: 16:00
  • Contents (SHOULD BE DISCUSSED)
    • (0)8-9: Confirm NO large SNR events in the last night observing run -> If the events exist, stop the following works and have discussions.

    • (1)9-10: CAL for the previous week's observation(CAL-G). The shooting of the mirror height(Yuzurihara). Finesse measurement(Oshino).
    • (2)10-12:
      • Kagra site staff: Instrument checks (Please call Hayakawa-kun to allow the activities in the KAGRA site. If during his absence, please call Takahashi(masa)-san, or Sawada-san or Yamaguchi-san, in this order.)
        • Hayakawa-kun or the technical staff will call the control room if the activities are finished.
      • VAC/CRY: Checked by Kimura-san + KAGRA site staff.
      • VIS offload if necessary (Takahashi.R)
    • (3)13-14: Kamioka Mine Company: Tunnel Inspection.
      • VAC/CRY: Checked by Kimura-san + KAGRA site staff.
    • (4)After(3): CAL for the next week's observation.
    • (5)Restart observation after(3)
  • CAL activities (NEED LINK UPDATE)
  • DGS
    • In basic, we don't touch.