Differences between revisions 17 and 18
Revision 17 as of 2016-02-25 11:52:18
Size: 1398
Comment:
Revision 18 as of 2016-02-25 11:53:53
Size: 1540
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
  [[attachment:PMC_Guardian.png|{{attachment:PMC_Guardian.png|PMC Guardian|width="600"}}]]
 -- Request "PSL_LOCKED"
 -- Execute (Choose "EXEC")

IFO Operation Manual

General

  • Type "mk" on terminal and you will open a "sitemap" screen

PSL

Lock PMC

  • Open the "PSL PMC" medm screen from sitmap

PMC medm

  • Open StripTool /users/dv/PMCMON.xml (link is put on the PMC screen)

  • Find PMC_TRANS Camera
  • Open the Guardian screen (link on the PMC screen)

PMC Guardian

  • -- Request "PSL_LOCKED" -- Execute (Choose "EXEC")
  • Make sure that PMC is locked

IMC

Lock IMC

  • Check MCI, MCO and MCE (link to VIS page. DC alignment values, Watchdog, Dackill)
  • Put Guardian usage here
  • Open StripTool /users/dv/IMCMON.xml

  • MCE_TRANS camera
  • Make sure IMC is locked

Main IFO

Check VIS

  • Check PR3, BS, IX and IY (link to VIS page)

Initial Alignment

  • Establish the alignment procedure
  • Make the initial alignment script
  • Put the script usage

Lock Michelson IFO

  • Establish the lock procedure
  • Prepare Guardian and put the manual here
  • Prepare StripTool (list of check channels)

Check DAQ

  • DaqCheck1 Check if the real time models are sending data to DAQ

  • DaqCheck2 Check if the GW channel is properly recorded in the frames

  • Check Detchar screen?
  • Check glitch rate (prepare a script?)
  • Check noise lines (prepare a script?)

In the case of IFO/susbsystem failure or emergency

KAGRA/Observation/iKAGRA/Manual/MIF (last edited 2016-03-25 10:56:26 by YutaMichimura)