Differences between revisions 5 and 11 (spanning 6 versions)
Revision 5 as of 2016-02-04 09:52:47
Size: 690
Comment:
Revision 11 as of 2016-02-10 17:20:45
Size: 1073
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
 * Prepare StripTool (list of check channels)  * Open StripTool /users/dv/PMCMON.xml
 * PMC_TRANS Camera
 * Make sure that PMC is locked
Line 11: Line 13:
 * Check MCI, MCO and MCE (link to VIS page. Mention about Watchdog, Dackill)
Line 13: Line 15:
 * Prepare StripTool (list of check channels)
 * Open StripTool /users/dv/IMCMON.xml
 * MCE_TRANS camera
 * Make sure IMC is locked
Line 17: Line 20:
=== Check VIS ===
 * Check PR3, BS, IX and IY (link to VIS page)
Line 29: Line 34:
 * DaqCheck1 Check if the real time models are sending data to DAQ
Line 30: Line 36:
 * Check glitch rate (prepare a script?)
 * Check noise lines (prepare a script?)

IFO Operation Manual

PSL

Lock PMC

  • Prepare Guardian
  • Open StripTool /users/dv/PMCMON.xml

  • PMC_TRANS Camera
  • Make sure that PMC is locked

IMC

Lock IMC

  • Check MCI, MCO and MCE (link to VIS page. Mention about Watchdog, Dackill)
  • Put Guardian usage here
  • Open StripTool /users/dv/IMCMON.xml

  • MCE_TRANS camera
  • Make sure IMC is locked

Main IFO

Check VIS

  • Check PR3, BS, IX and IY (link to VIS page)

Initial Alignment

  • Establish the alignment procedure
  • Make the initial alignment script
  • Put the script usage

Lock Michelson IFO

  • Establish the lock procedure
  • Prepare Guardian and put the manual here
  • Prepare StripTool (list of check channels)

Check DAQ

  • DaqCheck1 Check if the real time models are sending data to DAQ

  • Check if the GW channel is properly recorded in the frames
  • Check glitch rate (prepare a script?)
  • Check noise lines (prepare a script?)

In the case of IFO/susbsystem failure or emergency

KAGRA/Observation/iKAGRA/Manual/MIF (last edited 2016-03-25 10:56:26 by YutaMichimura)