Differences between revisions 13 and 14
Revision 13 as of 2016-03-24 15:15:14
Size: 780
Editor: AyakaShoda
Comment:
Revision 14 as of 2016-03-24 15:18:54
Size: 1212
Editor: AyakaShoda
Comment:
Deletions are marked like this. Additions are marked like this.
Line 20: Line 20:
[[attachment:TroubleshootFlowchart.png|{{attachment:TroubleshootFlowchart.png|text describing image|width=300}}]] [[attachment:TroubleshootFlowchart.png|{{attachment:TroubleshootFlowchart.png|text describing image|width=800}}]]

==== Details of the check points ====
[[attachment:CheckPoint1-3.png|{{attachment:PR3overview.png|text describing image|width=800}}]]
[[attachment:CheckPoint5-6.png|{{attachment:PR3overview.png|text describing image|width=800}}]]

 1. Check point (1): Do OSEM values stay stable within +/- 3 um?
   The


==== Appendix ====
[[attachment:PR3overview.png|{{attachment:PR3overview.png|text describing image|width=800}}]]

Mode Cleaner Suspensions

Each MC suspension has 4 coils and 2 pico-motors (pitch, yaw).

ETM

Each iKAGRA ETM suspension has 4 coils and 4 pico-motors (pitch:1-6, yaw:2-7, z:3-8, y:4-9).

If you find a problem about coil-magnet actuator, please check 2 things.

1. Coil drivers in particular for Y-end had a loose connection with power line (-18V, -15V).

Please check the LED on coil driver. If the LED is out, try to fasten the power line.

2. Sometimes watchdog? system stop the output current from the coil driver in order to protect mechanical system.

PR3

Check the PR3 status according to the flowchart below.

text describing image

Details of the check points

text describing image text describing image

  1. Check point (1): Do OSEM values stay stable within +/- 3 um?
    • The

Appendix

text describing image

KAGRA/Observation/iKAGRA/Manual/VIS (last edited 2016-03-24 17:13:06 by AyakaShoda)