Differences between revisions 12 and 16 (spanning 4 versions)
Revision 12 as of 2024-06-14 09:12:34
Size: 4429
Editor: miyoki
Comment:
Revision 16 as of 2024-06-14 14:31:49
Size: 4458
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 63: Line 63:
  * Flash check again before closing.
Line 68: Line 69:
  * Review document: https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=15844
Line 79: Line 81:
  * acceptance by Ushiba-kun: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29905
Line 96: Line 97:
  * tie rod adjustment between EXC and TMSX to avoid stress when the only EXC side is pumped down.
  * Nasty air parts were replaced.
  * Vacuum alert recovery after pumping down.
  * tie rod adjustment between EYC and TMSY to avoid stress when the only EYC side is pumped down.
  * Nasty air parts were replaced. -. Done
  * Vacuum alert recovery after pumping down. 
Line 100: Line 101:
  * The broken cc-10 was replaced.
  * N2 purge is necessary for EXV.
  * Pumping down from EYA


EYC Recovery(20240407)


KAGRA/Recovery2024/EYC (last edited 2024-07-03 06:30:23 by miyoki)