Suspension Condition of PRM, IMMT1/2. (Takahashi-san, Ushiba-kun)


IMMT1/2, PRM


Beam Path from IMC to PRM (Yokozawa-kun, and Akutsu-kun)


Activities:

IMC to STM1

STM1/2

IFI to IMMT1

IMMT1-IMMT2

IMMT2-PRM

Around PRM

Main Beam Dumper

Beam dump(T.Akutsu)


PRM Cleaning (Hirata-san, Aso-kun)


PRM


Oplev Check for PRM, IMMT1. (Yokozawa-kun)


Activities:

Beam Power

Beam Path Clearance

QPD centering

Calibration

Spectrum Health

Oplev beam's stray light influence

Oplev table covering


ISS path


Check the path by Akutsu-kun


Vacuum system (Kimura/Uchiyama and their selected persons)


Close GV btw PRM and PR3 and stad bolt nut adjustment btw PRM and PR3

Clean inside as much as possible including the bellows duct with TMP

Check the flange seal surface condition where were opened.

Decide where the elastomer/Metal gasket will be used.

Check the opened flanges and the top hut of PRM

Logistic to reinstall the bellows duct with TMP.

KAGRA/Recovery2024/IFIPRM (last edited 2024-05-02 21:18:00 by miyoki)