Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2024-04-27 07:59:10
Size: 2777
Editor: miyoki
Comment:
Revision 5 as of 2024-04-27 08:28:25
Size: 2399
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
Optical Path from IMC to PRM Suspension Condition of IMMT1/2. (Takahashi, Ushiba)
----
IMMT1/2
  * Mechanical Motion
   * Smooth pico motion and its default position
    *
   * Gaps between magnets and coils
    *
   * Gaps between EQ stoppers and mirrors -> confirmed less than 1mm.
    *
  * Electrical wirings
   * Coil resistances and inductances ->
    *
   * Isolation of Wiring from coils to flanges(pico and mag-coil) ->
    *
   * Fixing on tables is tight and reliable?
    *
  * Smooth Mag-coil motion and balance and TFs
   *
  * Spectrum
   *


 * Mirror conditions(??)
  * Clean around the center?
   *


 *Beam dump(T.Akutsu)
  * Beam shield
   *
  * Beam dumps were additionally added?
   * In basic, No. Relocation was done.


----
Beam Path from IMC to PRM (Yokozawa, and Akutsu)
Line 6: Line 42:
 * Mirror mount stability with cables
 * Beam positions on them
 * Trans beam from STM2
Line 7: Line 46:
IFI to IMMT1
 * IFI injection: No clipping
 * Beam position on IMMT1
 * Trans beam of IMMT1
  * No change to ISS path?
  * ISS beam/CWP reflection beam extracting (??)
  * the beam paths are clear?
  * The beams hit around the center of windows?
  * The reflected beams on the windows are dumped?
 
IMMT1-IMMT2
 * Beam clearance: no problem
 * Beam position on IMMT2

IMMT2-PRM
 * Main beam/misaligned beam clearances: no problem against the beam dumper
 * The misaligned beam position: hits on the dumper(?) and the temp enhancement was detected.

Around PRM
 * Beam position on PRM
 * IR beam in the midsize baffles(HR/AR side)

Beam Dumper
 * Thermometer works?
Line 14: Line 77:
 *0.7-0.8 mW input:  *
Line 34: Line 97:
Oplev table Covering Oplev table covering
Line 38: Line 101:
---------------------------------------------------------------- ----
Vacuum system (Kimura/Uchiyama and their selected persons)
----
Clean inside as much as possible including bellows duct with TMP
 *
Line 40: Line 107:
----
(3)Mid-size Baffles (Akutsu-kun and his selected persons)
----

Done on 22nd August.

Approved all processes of setting the mid-size baffles.

(SR3 oplev path is pointed out to be near the structure.)


----
(4)Beam Path (Ushiba-kun, Tanaka-kun?, Hirose-san?)
----
Main beam
- IR beam hit and through around the center (or acceptable area) of optics from inside IFI tank -> SRM.

GR beam
- GR beam hit and through around the center (or acceptable area) of optics?
  (assuming GR beam on POP/POS also pass through around the center (or acceptable area) of optics)

IR from the misaligned PRM
- Does it hit on the Dumper?
- The misaligned position repeatability is good or well controlled by oplev/something?

Relative positions btw Mid-size baffles and IR/GR.


AR-SRM reflection beam control
- Where is the reflected beam from SRM? When misaligned, should it hit the mid-size baffle on SR2 or other? Should we make it possible to align SRM even if it has less reflectivity for RSE?


----
(5)IFI-IMMT tank
----
Stray light mitigation(Akutus-kun and selected persons)
- The predicted stray beams are dumped?
- Is there any missing stray beam paths?

ISS beam/CWP reflection beam extracting (??)
- the beam paths are clear?
- The beams hit around the center of windows?
- The reflected beams on the windows are dumped?

(The IFI new poles seem to be dangerous due to the vibration made by drilling.)

Beam dumper(Akutsu-kun and selected pesrons)
- Does the thermometer works?


----
(6)Vacuum system (Kimura-san / Uchiyama-kun and their selected persons)
----
Numbering for all ports.

Check the flange seal surface condition.
Check the flange seal surface condition where were opened.
 * KF400 flange with a Copper plate-> change with a curved flange.
 *
Line 98: Line 112:
 *
Line 99: Line 114:
Top hat seal surface check for SRM/2/3 BS PRM/2/3.

ICF152 flange preparation for the new reducer flanges at SRM/PRM.

Check dust/fungus in stocked tubes/bellows.



----
(7)Cleanness of Mirrors HR/AR
----
FC was done for all mirrors' HR/AR, except for OMC Typ-C mirrors.

Check the surfaces and inside again before closing, and blow/absorb as much as possible if you find anything.


----
(8)Vacuum tank cleaning
----
In Basic, the cleaning was done after FC.
Check inside again and clean just before closing if you find something.
Logistic to reinstall the bellows duct with TMP.
 * Sawada-sana nd Mirapro members call
 *


Suspension Condition of IMMT1/2. (Takahashi, Ushiba)


IMMT1/2

  • Mechanical Motion
    • Smooth pico motion and its default position
    • Gaps between magnets and coils
    • Gaps between EQ stoppers and mirrors -> confirmed less than 1mm.

  • Electrical wirings
    • Coil resistances and inductances ->

    • Isolation of Wiring from coils to flanges(pico and mag-coil) ->

    • Fixing on tables is tight and reliable?
  • Smooth Mag-coil motion and balance and TFs
  • Spectrum
  • Mirror conditions(??)
    • Clean around the center?
  • Beam dump(T.Akutsu)
    • Beam shield
    • Beam dumps were additionally added?
      • In basic, No. Relocation was done.


Beam Path from IMC to PRM (Yokozawa, and Akutsu)


STM1/2

  • Mirror mount stability with cables
  • Beam positions on them
  • Trans beam from STM2

IFI to IMMT1

  • IFI injection: No clipping
  • Beam position on IMMT1
  • Trans beam of IMMT1
    • No change to ISS path?
    • ISS beam/CWP reflection beam extracting (??)
    • the beam paths are clear?
    • The beams hit around the center of windows?
    • The reflected beams on the windows are dumped?

IMMT1-IMMT2

  • Beam clearance: no problem
  • Beam position on IMMT2

IMMT2-PRM

  • Main beam/misaligned beam clearances: no problem against the beam dumper
  • The misaligned beam position: hits on the dumper(?) and the temp enhancement was detected.

Around PRM

  • Beam position on PRM
  • IR beam in the midsize baffles(HR/AR side)

Beam Dumper

  • Thermometer works?


Oplev Check for IMMT1. (Yokozawa-kun)


Beam Power

Beam Path Clearance

  • IMMT1

QPD centering

Calibration

PYL Separation(after pumping?)

Spectrum Health

Oplev beam's stray light influence

  • almost no light? as before.

Oplev table covering

  • we will do this after closing.


Vacuum system (Kimura/Uchiyama and their selected persons)


Clean inside as much as possible including bellows duct with TMP

Check the flange seal surface condition where were opened.

  • KF400 flange with a Copper plate-> change with a curved flange.

Decide where the elastomer/Metal gasket will be used.

Logistic to reinstall the bellows duct with TMP.

  • Sawada-sana nd Mirapro members call

KAGRA/Recovery2024/IFIPRM (last edited 2024-05-02 21:18:00 by miyoki)