Line 2: Line 2:
Suspension Condition of PRM, IMMT1/2. (Takahashi, Ushiba) Suspension Condition of PRM, IMMT1/2. (Takahashi-san, Ushiba-kun)
Line 11: Line 11:
      * Yaw Pico is at near the edge. --> Acceptable
Line 12: Line 13:
      * Though the EQ stop frame on the XY stage is unstable, the jump of the TM pitch is within the Oplev range. --> Acceptable
Line 14: Line 16:
      * The balance of the TM was recovered by regluing of three magnets.
      * The wire cramp on the IM for the TM was tightened.
      * Height adjustment.
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28710
      * Position measurement of the traverser.
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29366
Line 19: Line 27:
   * Fixing on tables is tight and reliable?
    *
   * Cable repair for the BF damper. The lead wires were glued to prevent direct touching of the wires to the coil bobbins.
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28712
   * Fixing the cable connector for SF LVDT
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28586
Line 23: Line 33:
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29320
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29319
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29348
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29349
   * IMMT2: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29320
   * IMMT1: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29319
   * PRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29348
   * PRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29349
Line 33: Line 43:
 *Beam dump(T.Akutsu)
  * Beam shield
   *
  * Beam dumps were additionally added?
   * In basic, No. Relocation was done.

Line 41: Line 44:
Beam Path from IMC to PRM (Yokozawa, and Akutsu) Beam Path from IMC to PRM (Yokozawa-kun, and Akutsu-kun)
Line 45: Line 48:
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29261
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29271
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29273
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29282
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29283
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29285
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29299
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29308
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29334
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29342
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29343
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29261 (Finalization of IFI-IMM-PRM: Day 1 PM)
  * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29271 (Comment to Finalization of IFI-IMM-PRM: Day 1 PM)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29273 (Finalization of IFI-IMM-PRM: Day 2)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29282 (Finalization of IFI-IMM-PRM: Day 3 AM)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29283 (Finalization of IFI-IMM-PRM: Day 3 PM)
  * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29285 (Comment to Finalization of IFI-IMM-PRM: Day 3 PM)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29299 (Finalization of IFI-IMM-PRM: Day 4)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29308 (Finalization of IFI-IMM-PRM: Day 5)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29334 (Finalization of IFI-IMM-PRM: Day 6)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29342 (Finalization of IFI-IMM-PRM: Day 7-1)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29343 (Finalization of IFI-IMM-PRM: Day 7-2)
Line 78: Line 81:
 * Beam position on IMMT2  * Beam position on IMMT2: shifted from the center.
Line 90: Line 93:
 * Visual Inspection:
 * Beam Clearance:
 * Visual Inspection: after the IR recovery. --> https://gokagra.slack.com/archives/C015MC5U0R1/p1714622532391079 so OK.
 * Beam Clearance: OK with the main IR beam
Line 93: Line 96:
Stray light dumpers
 *

Beam dump(T.Akutsu)
  * some shiny remnant: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29343, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29342
  * Beam dumps were additionally added?
   * In basic, No Relocation was done?
Line 97: Line 103:
PRM Cleaning PRM Cleaning (Hirata-san, Aso-kun)
Line 100: Line 106:
 * final condition
* https://klog.icrr.u-tokyo.ac.jp/osl/?r=29254
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29244
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29228
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29216
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29202
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29254 (April 17): Acceptable ?
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29244 (April 16)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29228 (April 15)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29216 (April 12)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29202 (April 11)
Line 109: Line 114:
Oplev Check for IMMT1. (Yokozawa-kun) Oplev Check for PRM, IMMT1. (Yokozawa-kun)
Line 140: Line 145:
ISS path
----
Check the path by Akutsu-kun
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29384


----
Line 149: Line 161:
 * KF400 flange with a Copperplate -> change with a curved flange.   *  * KF400 flange with a Copperplate -> change with a curved flange: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29377
Line 155: Line 166:
Check the opened flanges and the top hut of PRM
 *
Line 158: Line 172:
 * Careful cramp tightening near oplevs.
 *


Suspension Condition of PRM, IMMT1/2. (Takahashi-san, Ushiba-kun)


IMMT1/2, PRM

  • Mirror conditions(??)
    • Clean around the center?


Beam Path from IMC to PRM (Yokozawa-kun, and Akutsu-kun)


Activities:

IMC to STM1

  • Beam clearance: OK

STM1/2

  • Mirror mount stability with cables
  • Beam positions on them
  • Trans beam from STM2

IFI to IMMT1

  • IFI injection: No clipping
  • Beam position on IMMT1
  • Trans beam of IMMT1
    • No change to ISS path?
    • ISS beam/CWP reflection beam extracting (??)
    • the beam paths are clear?
    • The beams hit around the center of windows?
    • The reflected beams on the windows are dumped?

IMMT1-IMMT2

  • Beam clearance: no problem
  • Beam position on IMMT2: shifted from the center.

IMMT2-PRM

  • Main beam/misaligned beam clearances: no problem against the beam dumper
  • The misaligned beam position: hits on the dumper(?) and the temp enhancement was detected.

Around PRM

  • Beam position on PRM
  • IR beam in the midsize baffles(HR/AR side)

Main Beam Dumper

Beam dump(T.Akutsu)


PRM Cleaning (Hirata-san, Aso-kun)


PRM


Oplev Check for PRM, IMMT1. (Yokozawa-kun)


Activities:

Beam Power

Beam Path Clearance

  • IMMT1

QPD centering

Calibration

Spectrum Health

Oplev beam's stray light influence

  • almost no light? as before.

Oplev table covering

  • we will do this after closing.


ISS path


Check the path by Akutsu-kun


Vacuum system (Kimura/Uchiyama and their selected persons)


Close GV btw PRM and PR3 and stad bolt nut adjustment btw PRM and PR3

Clean inside as much as possible including the bellows duct with TMP

Check the flange seal surface condition where were opened.

Decide where the elastomer/Metal gasket will be used.

Check the opened flanges and the top hut of PRM

Logistic to reinstall the bellows duct with TMP.

  • Sawada-sana and Mirapro members call
  • If you use chain block, please be careful of its fixing
  • Careful cramp tightening near oplevs.