Line 2: Line 2:
Suspension Condition of IMMT1/2. (Takahashi, Ushiba) Suspension Condition of PRM, IMMT1/2. (Takahashi, Ushiba)
Line 4: Line 4:
IMMT1/2 IMMT1/2, PRM
Line 7: Line 7:
    *
Line 9: Line 8:
    *
Line 11: Line 9:
    *     * IMMT1/2
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29314
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29313
    * PRM
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28380
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29366
Line 20: Line 23:
   *



  * Spectrum
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29320
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29319
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29348
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29349
Line 31: Line 34:
 *Beam dump(T.Akutsu)
  * Beam shield
   *
  * Beam dumps were additionally added?
   * In basic, No. Relocation was done.

Line 41: Line 37:

Activities:
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29261
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29271
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29273
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29282
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29283
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29285
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29299
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29308
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29334
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29342
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29343


IMC to STM1
 * Beam clearance: OK
Line 59: Line 72:
 * Beam position on IMMT2  * Beam position on IMMT2: shifted from the center.
Line 69: Line 82:
Beam Dumper
 * Thermometer works?
Main Beam Dumper
 * Thermometer works: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29340
 * Visual Inspection: after the IR recovery.
 * Beam Clearance: OK with the main IR beam


Beam dump(T.Akutsu)
  * some shiny remnant: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29343, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29342
  * Beam dumps were additionally added?
   * In basic, No. Relocation was done?

----
PRM Cleaning
----
PRM
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29254
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29244
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29228
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29216
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29202
Line 76: Line 107:

Activities:
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29337
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28916
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28897
Line 89: Line 125:
PYL Separation(after pumping?)
 *
Line 103: Line 136:
(5)IFI-IMMT tank ISS path
Line 105: Line 138:
Stray light mitigation(Akutus-kun and selected persons)
- The predicted stray beams are dumped?
- Is there any missing stray beam paths?

ISS beam/CWP reflection beam extracting (??)
- the beam paths are clear?
- The beams hit around the center of windows?
- The reflected beams on the windows are dumped?

(The IFI new poles seem to be dangerous due to the vibration made by drilling.)

Beam dumper(Akutsu-kun and selected pesrons)
- Does the thermometer works?
Check the path by Miyakawa-kun
 *??
Line 121: Line 143:
(6)Vacuum system (Kimura-san / Uchiyama-kun and their selected persons) Vacuum system (Kimura/Uchiyama and their selected persons)
Line 123: Line 145:
Numbering for all ports. Close GV btw PRM and PR3 and stad bolt nut adjustment btw PRM and PR3
 *
Line 125: Line 148:
Check the flange seal surface condition. Clean inside as much as possible including the bellows duct with TMP
 *

Check the flange seal surface condition where were opened.
 * KF400 flange with a Copperplate -> change with a curved flange.
 *
Line 128: Line 156:
 *
Line 129: Line 158:
Top hat seal surface check for SRM/2/3 BS PRM/2/3.

ICF152 flange preparation for the new reducer flanges at SRM/PRM.

Check dust/fungus in stocked tubes/bellows.



----
(7)Cleanness of Mirrors HR/AR
----
FC was done for all mirrors' HR/AR, except for OMC Typ-C mirrors.

Check the surfaces and inside again before closing, and blow/absorb as much as possible if you find anything.


----
(8)Vacuum tank cleaning
----
In Basic, the cleaning was done after FC.
Check inside again and clean just before closing if you find something.
Logistic to reinstall the bellows duct with TMP.
 * Sawada-sana and Mirapro members call
 * If you use chain block, please be careful of its fixing


Suspension Condition of PRM, IMMT1/2. (Takahashi, Ushiba)


IMMT1/2, PRM

  • Mirror conditions(??)
    • Clean around the center?


Beam Path from IMC to PRM (Yokozawa, and Akutsu)


Activities:

IMC to STM1

  • Beam clearance: OK

STM1/2

  • Mirror mount stability with cables
  • Beam positions on them
  • Trans beam from STM2

IFI to IMMT1

  • IFI injection: No clipping
  • Beam position on IMMT1
  • Trans beam of IMMT1
    • No change to ISS path?
    • ISS beam/CWP reflection beam extracting (??)
    • the beam paths are clear?
    • The beams hit around the center of windows?
    • The reflected beams on the windows are dumped?

IMMT1-IMMT2

  • Beam clearance: no problem
  • Beam position on IMMT2: shifted from the center.

IMMT2-PRM

  • Main beam/misaligned beam clearances: no problem against the beam dumper
  • The misaligned beam position: hits on the dumper(?) and the temp enhancement was detected.

Around PRM

  • Beam position on PRM
  • IR beam in the midsize baffles(HR/AR side)

Main Beam Dumper

Beam dump(T.Akutsu)


PRM Cleaning


PRM


Oplev Check for IMMT1. (Yokozawa-kun)


Activities:

Beam Power

Beam Path Clearance

  • IMMT1

QPD centering

Calibration

Spectrum Health

Oplev beam's stray light influence

  • almost no light? as before.

Oplev table covering

  • we will do this after closing.


ISS path


Check the path by Miyakawa-kun

  • ??


Vacuum system (Kimura/Uchiyama and their selected persons)


Close GV btw PRM and PR3 and stad bolt nut adjustment btw PRM and PR3

Clean inside as much as possible including the bellows duct with TMP

Check the flange seal surface condition where were opened.

  • KF400 flange with a Copperplate -> change with a curved flange.

Decide where the elastomer/Metal gasket will be used.

Logistic to reinstall the bellows duct with TMP.

  • Sawada-sana and Mirapro members call
  • If you use chain block, please be careful of its fixing