Suspension Condition of IMMT1/2. (Takahashi, Ushiba) | Suspension Condition of PRM, IMMT1/2. (Takahashi-san, Ushiba-kun) |
Line 4: | Line 4: |
IMMT1/2 | IMMT1/2, PRM |
Line 7: | Line 7: |
* | |
Line 9: | Line 8: |
* | |
Line 11: | Line 9: |
* | * IMMT1/2 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29314 * Yaw Pico is at near the edge. --> Acceptable * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29313 * Though the EQ stop frame on the XY stage is unstable, the jump of the TM pitch is within the Oplev range. --> Acceptable * PRM * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28380 * The balance of the TM was recovered by regluing of three magnets. * The wire cramp on the IM for the TM was tightened. * Height adjustment. * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28710 * Position measurement of the traverser. * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29366 |
Line 17: | Line 27: |
* Fixing on tables is tight and reliable? * |
* Cable repair for the BF damper. The lead wires were glued to prevent direct touching of the wires to the coil bobbins. * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28712 * Fixing the cable connector for SF LVDT * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28586 |
Line 20: | Line 32: |
* |
* Spectrum * IMMT2: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29320 * IMMT1: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29319 * PRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29348 * PRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29349 |
Line 31: | Line 43: |
*Beam dump(T.Akutsu) * Beam shield * * Beam dumps were additionally added? * In basic, No. Relocation was done. |
---- Beam Path from IMC to PRM (Yokozawa-kun, and Akutsu-kun) ---- Activities: * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29261 (Finalization of IFI-IMM-PRM: Day 1 PM) * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29271 (Comment to Finalization of IFI-IMM-PRM: Day 1 PM) * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29273 (Finalization of IFI-IMM-PRM: Day 2) * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29282 (Finalization of IFI-IMM-PRM: Day 3 AM) * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29283 (Finalization of IFI-IMM-PRM: Day 3 PM) * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29285 (Comment to Finalization of IFI-IMM-PRM: Day 3 PM) * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29299 (Finalization of IFI-IMM-PRM: Day 4) * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29308 (Finalization of IFI-IMM-PRM: Day 5) * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29334 (Finalization of IFI-IMM-PRM: Day 6) * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29342 (Finalization of IFI-IMM-PRM: Day 7-1) * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29343 (Finalization of IFI-IMM-PRM: Day 7-2) |
Line 38: | Line 61: |
---- Beam Path from IMC to PRM (Yokozawa, and Akutsu) ---- |
IMC to STM1 * Beam clearance: OK |
Line 59: | Line 81: |
* Beam position on IMMT2 | * Beam position on IMMT2: shifted from the center. |
Line 69: | Line 91: |
Beam Dumper * Thermometer works? |
Main Beam Dumper * Thermometer works: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29340 * Visual Inspection: after the IR recovery. * Beam Clearance: OK with the main IR beam Beam dump(T.Akutsu) * some shiny remnant: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29343, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29342 * Beam dumps were additionally added? * In basic, No. Relocation was done? ---- PRM Cleaning (Hirata-san, Aso-kun) ---- PRM * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29254 (April 17): Acceptable ? * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29244 (April 16) * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29228 (April 15) * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29216 (April 12) * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29202 (April 11) |
Line 74: | Line 114: |
Oplev Check for IMMT1. (Yokozawa-kun) | Oplev Check for PRM, IMMT1. (Yokozawa-kun) |
Line 76: | Line 116: |
Activities: * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29337 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28916 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28897 |
|
Line 89: | Line 134: |
PYL Separation(after pumping?) * |
|
Line 103: | Line 145: |
(5)IFI-IMMT tank | ISS path |
Line 105: | Line 147: |
Stray light mitigation(Akutus-kun and selected persons) - The predicted stray beams are dumped? - Is there any missing stray beam paths? ISS beam/CWP reflection beam extracting (??) - the beam paths are clear? - The beams hit around the center of windows? - The reflected beams on the windows are dumped? (The IFI new poles seem to be dangerous due to the vibration made by drilling.) Beam dumper(Akutsu-kun and selected pesrons) - Does the thermometer works? |
Check the path by Akutsu-kun * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29384 |
Line 121: | Line 152: |
(6)Vacuum system (Kimura-san / Uchiyama-kun and their selected persons) | Vacuum system (Kimura/Uchiyama and their selected persons) |
Line 123: | Line 154: |
Numbering for all ports. | Close GV btw PRM and PR3 and stad bolt nut adjustment btw PRM and PR3 * |
Line 125: | Line 157: |
Check the flange seal surface condition. | Clean inside as much as possible including the bellows duct with TMP * Check the flange seal surface condition where were opened. * KF400 flange with a Copperplate -> change with a curved flange: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29377 |
Line 128: | Line 164: |
* | |
Line 129: | Line 166: |
Top hat seal surface check for SRM/2/3 BS PRM/2/3. ICF152 flange preparation for the new reducer flanges at SRM/PRM. Check dust/fungus in stocked tubes/bellows. ---- (7)Cleanness of Mirrors HR/AR ---- FC was done for all mirrors' HR/AR, except for OMC Typ-C mirrors. Check the surfaces and inside again before closing, and blow/absorb as much as possible if you find anything. ---- (8)Vacuum tank cleaning ---- In Basic, the cleaning was done after FC. Check inside again and clean just before closing if you find something. |
Logistic to reinstall the bellows duct with TMP. * Sawada-sana and Mirapro members call * If you use chain block, please be careful of its fixing |
Suspension Condition of PRM, IMMT1/2. (Takahashi-san, Ushiba-kun)
IMMT1/2, PRM
- Mechanical Motion
- Smooth pico motion and its default position
- Gaps between magnets and coils
Gaps between EQ stoppers and mirrors -> confirmed less than 1mm.
- IMMT1/2
https://klog.icrr.u-tokyo.ac.jp/osl/?r=29314
Yaw Pico is at near the edge. --> Acceptable
https://klog.icrr.u-tokyo.ac.jp/osl/?r=29313
Though the EQ stop frame on the XY stage is unstable, the jump of the TM pitch is within the Oplev range. --> Acceptable
- PRM
https://klog.icrr.u-tokyo.ac.jp/osl/?r=28380
- The balance of the TM was recovered by regluing of three magnets.
- The wire cramp on the IM for the TM was tightened.
- Height adjustment.
https://klog.icrr.u-tokyo.ac.jp/osl/?r=28710
- Position measurement of the traverser.
- IMMT1/2
- Electrical wirings
Coil resistances and inductances ->
Isolation of Wiring from coils to flanges(pico and mag-coil) ->
- Cable repair for the BF damper. The lead wires were glued to prevent direct touching of the wires to the coil bobbins.
- Fixing the cable connector for SF LVDT
- Smooth Mag-coil motion and balance and TFs
- Spectrum
- Mirror conditions(??)
- Clean around the center?
- Clean around the center?
Beam Path from IMC to PRM (Yokozawa-kun, and Akutsu-kun)
Activities:
https://klog.icrr.u-tokyo.ac.jp/osl/?r=29261 (Finalization of IFI-IMM-PRM: Day 1 PM)
https://klog.icrr.u-tokyo.ac.jp/osl/?r=29271 (Comment to Finalization of IFI-IMM-PRM: Day 1 PM)
https://klog.icrr.u-tokyo.ac.jp/osl/?r=29273 (Finalization of IFI-IMM-PRM: Day 2)
https://klog.icrr.u-tokyo.ac.jp/osl/?r=29282 (Finalization of IFI-IMM-PRM: Day 3 AM)
https://klog.icrr.u-tokyo.ac.jp/osl/?r=29283 (Finalization of IFI-IMM-PRM: Day 3 PM)
https://klog.icrr.u-tokyo.ac.jp/osl/?r=29285 (Comment to Finalization of IFI-IMM-PRM: Day 3 PM)
https://klog.icrr.u-tokyo.ac.jp/osl/?r=29299 (Finalization of IFI-IMM-PRM: Day 4)
https://klog.icrr.u-tokyo.ac.jp/osl/?r=29308 (Finalization of IFI-IMM-PRM: Day 5)
https://klog.icrr.u-tokyo.ac.jp/osl/?r=29334 (Finalization of IFI-IMM-PRM: Day 6)
https://klog.icrr.u-tokyo.ac.jp/osl/?r=29342 (Finalization of IFI-IMM-PRM: Day 7-1)
https://klog.icrr.u-tokyo.ac.jp/osl/?r=29343 (Finalization of IFI-IMM-PRM: Day 7-2)
IMC to STM1
- Beam clearance: OK
STM1/2
- Mirror mount stability with cables
- Beam positions on them
- Trans beam from STM2
IFI to IMMT1
- IFI injection: No clipping
- Beam position on IMMT1
- Trans beam of IMMT1
- No change to ISS path?
- ISS beam/CWP reflection beam extracting (??)
- the beam paths are clear?
- The beams hit around the center of windows?
- The reflected beams on the windows are dumped?
IMMT1-IMMT2
- Beam clearance: no problem
- Beam position on IMMT2: shifted from the center.
IMMT2-PRM
- Main beam/misaligned beam clearances: no problem against the beam dumper
- The misaligned beam position: hits on the dumper(?) and the temp enhancement was detected.
Around PRM
- Beam position on PRM
- IR beam in the midsize baffles(HR/AR side)
Main Beam Dumper
Thermometer works: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29340
- Visual Inspection: after the IR recovery.
- Beam Clearance: OK with the main IR beam
Beam dump(T.Akutsu)
some shiny remnant: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29343, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29342
- Beam dumps were additionally added?
- In basic, No. Relocation was done?
PRM Cleaning (Hirata-san, Aso-kun)
PRM
https://klog.icrr.u-tokyo.ac.jp/osl/?r=29254 (April 17): Acceptable ?
https://klog.icrr.u-tokyo.ac.jp/osl/?r=29244 (April 16)
https://klog.icrr.u-tokyo.ac.jp/osl/?r=29228 (April 15)
https://klog.icrr.u-tokyo.ac.jp/osl/?r=29216 (April 12)
https://klog.icrr.u-tokyo.ac.jp/osl/?r=29202 (April 11)
Oplev Check for PRM, IMMT1. (Yokozawa-kun)
Activities:
Beam Power
Beam Path Clearance
- IMMT1
QPD centering
Calibration
Spectrum Health
Oplev beam's stray light influence
- almost no light? as before.
Oplev table covering
- we will do this after closing.
ISS path
Check the path by Akutsu-kun
Vacuum system (Kimura/Uchiyama and their selected persons)
Close GV btw PRM and PR3 and stad bolt nut adjustment btw PRM and PR3
Clean inside as much as possible including the bellows duct with TMP
Check the flange seal surface condition where were opened.
KF400 flange with a Copperplate -> change with a curved flange: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29377
Decide where the elastomer/Metal gasket will be used.
Logistic to reinstall the bellows duct with TMP.
- Sawada-sana and Mirapro members call
- If you use chain block, please be careful of its fixing