Line 2: Line 2:
Suspension Condition of IMMT1/2. (Takahashi, Ushiba) Suspension Condition of PRM, IMMT1/2. (Takahashi-san, Ushiba-kun)
Line 4: Line 4:
IMMT1/2 IMMT1/2, PRM
Line 7: Line 7:
    *
Line 9: Line 8:
    *
Line 11: Line 9:
    *     * IMMT1/2
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29314
      * Yaw Pico is at near the edge. --> Acceptable
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29313
      * Though the EQ stop frame on the XY stage is unstable, the jump of the TM pitch is within the Oplev range. --> Acceptable
    * PRM
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28380
      * The balance of the TM was recovered by regluing of three magnets.
      * The wire cramp on the IM for the TM was tightened.
      * Height adjustment.
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28710
      * Position measurement of the traverser.
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29366
Line 17: Line 27:
   * Fixing on tables is tight and reliable?
    *
   * Cable repair for the BF damper. The lead wires were glued to prevent direct touching of the wires to the coil bobbins.
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28712
   * Fixing the cable connector for SF LVDT
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28586
Line 20: Line 32:
   *



  * Spectrum
   * IMMT2: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29320
   * IMMT1: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29319
   * PRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29348
   * PRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29349
Line 31: Line 43:
 *Beam dump(T.Akutsu)
  * Beam shield
   *
  * Beam dumps were additionally added?
   * In basic, No. Relocation was done.
----
Beam Path from IMC to PRM (Yokozawa-kun, and Akutsu-kun)
----

Activities:
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29261 (Finalization of IFI-IMM-PRM: Day 1 PM)
  * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29271 (Comment to Finalization of IFI-IMM-PRM: Day 1 PM)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29273 (Finalization of IFI-IMM-PRM: Day 2)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29282 (Finalization of IFI-IMM-PRM: Day 3 AM)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29283 (Finalization of IFI-IMM-PRM: Day 3 PM)
  * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29285 (Comment to Finalization of IFI-IMM-PRM: Day 3 PM)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29299 (Finalization of IFI-IMM-PRM: Day 4)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29308 (Finalization of IFI-IMM-PRM: Day 5)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29334 (Finalization of IFI-IMM-PRM: Day 6)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29342 (Finalization of IFI-IMM-PRM: Day 7-1)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29343 (Finalization of IFI-IMM-PRM: Day 7-2)
Line 38: Line 61:
----
Beam Path from IMC to PRM (Yokozawa, and Akutsu)
----
IMC to STM1
 * Beam clearance: OK
Line 59: Line 81:
 * Beam position on IMMT2  * Beam position on IMMT2: shifted from the center.
Line 69: Line 91:
Beam Dumper
 * Thermometer works?
Main Beam Dumper
 * Thermometer works: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29340
 * Visual Inspection: after the IR recovery. --> https://gokagra.slack.com/archives/C015MC5U0R1/p1714622532391079 so OK.
 * Beam Clearance: OK with the main IR beam


Beam dump(T.Akutsu)
  * some shiny remnant: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29343, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29342
  * Beam dumps were additionally added?
   * In basic, No Relocation was done?

----
PRM Cleaning (Hirata-san, Aso-kun)
----
PRM
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29254 (April 17): Acceptable ?
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29244 (April 16)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29228 (April 15)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29216 (April 12)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29202 (April 11)
Line 74: Line 114:
Oplev Check for IMMT1. (Yokozawa-kun) Oplev Check for PRM, IMMT1. (Yokozawa-kun)
Line 76: Line 116:

Activities:
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29337
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28916
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28897
Line 89: Line 134:
PYL Separation(after pumping?)
 *
Line 103: Line 145:
(5)IFI-IMMT tank ISS path
Line 105: Line 147:
Stray light mitigation(Akutus-kun and selected persons)
- The predicted stray beams are dumped?
- Is there any missing stray beam paths?

ISS beam/CWP reflection beam extracting (??)
- the beam paths are clear?
- The beams hit around the center of windows?
- The reflected beams on the windows are dumped?

(The IFI new poles seem to be dangerous due to the vibration made by drilling.)

Beam dumper(Akutsu-kun and selected pesrons)
- Does the thermometer works?
Check the path by Akutsu-kun
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29384
Line 121: Line 152:
(6)Vacuum system (Kimura-san / Uchiyama-kun and their selected persons) Vacuum system (Kimura/Uchiyama and their selected persons)
Line 123: Line 154:
Numbering for all ports. Close GV btw PRM and PR3 and stad bolt nut adjustment btw PRM and PR3
 *
Line 125: Line 157:
Check the flange seal surface condition. Clean inside as much as possible including the bellows duct with TMP
 *

Check the flange seal surface condition where were opened.
 * KF400 flange with a Copperplate -> change with a curved flange: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29377
Line 128: Line 164:
 *
Line 129: Line 166:
Top hat seal surface check for SRM/2/3 BS PRM/2/3. Check the opened flanges and the top hut of PRM
 *
Line 131: Line 169:
ICF152 flange preparation for the new reducer flanges at SRM/PRM.

Check dust/fungus in stocked tubes/bellows.



----
(7)Cleanness of Mirrors HR/AR
----
FC was done for all mirrors' HR/AR, except for OMC Typ-C mirrors.

Check the surfaces and inside again before closing, and blow/absorb as much as possible if you find anything.


----
(8)Vacuum tank cleaning
----
In Basic, the cleaning was done after FC.
Check inside again and clean just before closing if you find something.
Logistic to reinstall the bellows duct with TMP.
 * Sawada-sana and Mirapro members call
 * If you use chain block, please be careful of its fixing
 * Careful cramp tightening near oplevs.
 *


Suspension Condition of PRM, IMMT1/2. (Takahashi-san, Ushiba-kun)


IMMT1/2, PRM

  • Mirror conditions(??)
    • Clean around the center?


Beam Path from IMC to PRM (Yokozawa-kun, and Akutsu-kun)


Activities:

IMC to STM1

  • Beam clearance: OK

STM1/2

  • Mirror mount stability with cables
  • Beam positions on them
  • Trans beam from STM2

IFI to IMMT1

  • IFI injection: No clipping
  • Beam position on IMMT1
  • Trans beam of IMMT1
    • No change to ISS path?
    • ISS beam/CWP reflection beam extracting (??)
    • the beam paths are clear?
    • The beams hit around the center of windows?
    • The reflected beams on the windows are dumped?

IMMT1-IMMT2

  • Beam clearance: no problem
  • Beam position on IMMT2: shifted from the center.

IMMT2-PRM

  • Main beam/misaligned beam clearances: no problem against the beam dumper
  • The misaligned beam position: hits on the dumper(?) and the temp enhancement was detected.

Around PRM

  • Beam position on PRM
  • IR beam in the midsize baffles(HR/AR side)

Main Beam Dumper

Beam dump(T.Akutsu)


PRM Cleaning (Hirata-san, Aso-kun)


PRM


Oplev Check for PRM, IMMT1. (Yokozawa-kun)


Activities:

Beam Power

Beam Path Clearance

  • IMMT1

QPD centering

Calibration

Spectrum Health

Oplev beam's stray light influence

  • almost no light? as before.

Oplev table covering

  • we will do this after closing.


ISS path


Check the path by Akutsu-kun


Vacuum system (Kimura/Uchiyama and their selected persons)


Close GV btw PRM and PR3 and stad bolt nut adjustment btw PRM and PR3

Clean inside as much as possible including the bellows duct with TMP

Check the flange seal surface condition where were opened.

Decide where the elastomer/Metal gasket will be used.

Check the opened flanges and the top hut of PRM

Logistic to reinstall the bellows duct with TMP.

  • Sawada-sana and Mirapro members call
  • If you use chain block, please be careful of its fixing
  • Careful cramp tightening near oplevs.

KAGRA/Recovery2024/IFIPRM (last edited 2024-05-02 21:18:00 by miyoki)