Line 21: | Line 21: |
* Spectrum * |
|
Line 103: | Line 102: |
(5)IFI-IMMT tank | (6)Vacuum system (Kimura/Uchiyama and their selected persons) |
Line 105: | Line 104: |
Stray light mitigation(Akutus-kun and selected persons) - The predicted stray beams are dumped? - Is there any missing stray beam paths? |
Clean inside as much as possible including bellows duct with TMP * |
Line 109: | Line 107: |
ISS beam/CWP reflection beam extracting (??) - the beam paths are clear? - The beams hit around the center of windows? - The reflected beams on the windows are dumped? (The IFI new poles seem to be dangerous due to the vibration made by drilling.) Beam dumper(Akutsu-kun and selected pesrons) - Does the thermometer works? ---- (6)Vacuum system (Kimura-san / Uchiyama-kun and their selected persons) ---- Numbering for all ports. Check the flange seal surface condition. |
Check the flange seal surface condition where were opened. * KF400 flange with a Copper plate-> change with a curved flange. * |
Line 128: | Line 112: |
* | |
Line 129: | Line 114: |
Top hat seal surface check for SRM/2/3 BS PRM/2/3. ICF152 flange preparation for the new reducer flanges at SRM/PRM. Check dust/fungus in stocked tubes/bellows. ---- (7)Cleanness of Mirrors HR/AR ---- FC was done for all mirrors' HR/AR, except for OMC Typ-C mirrors. Check the surfaces and inside again before closing, and blow/absorb as much as possible if you find anything. ---- (8)Vacuum tank cleaning ---- In Basic, the cleaning was done after FC. Check inside again and clean just before closing if you find something. |
Logistic to reinstall the bellows duct with TMP. * Sawada-sana nd Mirapro members call * |
Suspension Condition of IMMT1/2. (Takahashi, Ushiba)
IMMT1/2
- Mechanical Motion
- Smooth pico motion and its default position
- Gaps between magnets and coils
Gaps between EQ stoppers and mirrors -> confirmed less than 1mm.
- Smooth pico motion and its default position
- Electrical wirings
Coil resistances and inductances ->
Isolation of Wiring from coils to flanges(pico and mag-coil) ->
- Fixing on tables is tight and reliable?
- Smooth Mag-coil motion and balance and TFs
- Spectrum
- Mirror conditions(??)
- Clean around the center?
- Clean around the center?
- Beam dump(T.Akutsu)
- Beam shield
- Beam dumps were additionally added?
- In basic, No. Relocation was done.
- Beam shield
Beam Path from IMC to PRM (Yokozawa, and Akutsu)
STM1/2
- Mirror mount stability with cables
- Beam positions on them
- Trans beam from STM2
IFI to IMMT1
- IFI injection: No clipping
- Beam position on IMMT1
- Trans beam of IMMT1
- No change to ISS path?
- ISS beam/CWP reflection beam extracting (??)
- the beam paths are clear?
- The beams hit around the center of windows?
- The reflected beams on the windows are dumped?
IMMT1-IMMT2
- Beam clearance: no problem
- Beam position on IMMT2
IMMT2-PRM
- Main beam/misaligned beam clearances: no problem against the beam dumper
- The misaligned beam position: hits on the dumper(?) and the temp enhancement was detected.
Around PRM
- Beam position on PRM
- IR beam in the midsize baffles(HR/AR side)
Beam Dumper
- Thermometer works?
Oplev Check for IMMT1. (Yokozawa-kun)
Beam Power
Beam Path Clearance
- IMMT1
QPD centering
Calibration
PYL Separation(after pumping?)
Spectrum Health
Oplev beam's stray light influence
- almost no light? as before.
Oplev table covering
- we will do this after closing.
(6)Vacuum system (Kimura/Uchiyama and their selected persons)
Clean inside as much as possible including bellows duct with TMP
Check the flange seal surface condition where were opened.
KF400 flange with a Copper plate-> change with a curved flange.
Decide where the elastomer/Metal gasket will be used.
Logistic to reinstall the bellows duct with TMP.
- Sawada-sana nd Mirapro members call