Differences between revisions 4 and 15 (spanning 11 versions)
Revision 4 as of 2024-04-27 08:27:28
Size: 2402
Editor: miyoki
Comment:
Revision 15 as of 2024-05-02 10:08:43
Size: 4267
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
Suspension Condition of IMMT1/2. (Takahashi, Ushiba) Suspension Condition of PRM, IMMT1/2. (Takahashi, Ushiba)
Line 4: Line 4:
IMMT1/2 IMMT1/2, PRM
Line 7: Line 7:
    *
Line 9: Line 8:
    *
Line 11: Line 9:
    *     * IMMT1/2
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29314
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29313
    * PRM
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28380
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29366
Line 20: Line 23:
   *
Line 22: Line 24:
   *
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29320
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29319
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29348
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29349
Line 30: Line 34:
 *Beam dump(T.Akutsu)
  * Beam shield
   *
  * Beam dumps were additionally added?
   * In basic, No. Relocation was done.

Line 40: Line 37:

Activities:
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29261
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29271
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29273
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29282
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29283
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29285
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29299
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29308
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29334
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29342
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29343


IMC to STM1
 * Beam clearance: OK
Line 58: Line 72:
 * Beam position on IMMT2  * Beam position on IMMT2: shifted from the center.
Line 68: Line 82:
Beam Dumper
 * Thermometer works?
Main Beam Dumper
 * Thermometer works: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29340
 * Visual Inspection: after the IR recovery.
 * Beam Clearance: OK with the main IR beam


Beam dump(T.Akutsu)
  * some shiny remnant: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29343, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29342
  * Beam dumps were additionally added?
   * In basic, No. Relocation was done?

----
PRM Cleaning
----
PRM
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29254
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29244
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29228
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29216
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29202
Line 75: Line 107:

Activities:
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29337
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28916
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28897
Line 88: Line 125:
PYL Separation(after pumping?)
 *
Line 102: Line 136:
(6)Vacuum system (Kimura/Uchiyama and their selected persons) ISS path
Line 104: Line 138:
Clean inside as much as possible including bellows duct with TMP Check the path by Miyakawa-kun
 *??


----
Vacuum system (Kimura/Uchiyama and their selected persons)
----
Close GV btw PRM and PR3 and stad bolt nut adjustment btw PRM and PR3
 *

Clean inside as much as possible including the bellows duct with TMP
Line 108: Line 152:
 * KF400 flange with a Copper plate-> change with a curved flange.  * KF400 flange with a Copperplate -> change with a curved flange.
Line 115: Line 159:
 * Sawada-sana nd Mirapro members call
 *
 * Sawada-sana and Mirapro members call
 * If you use chain block, please be careful of its fixing


Suspension Condition of PRM, IMMT1/2. (Takahashi, Ushiba)


IMMT1/2, PRM

  • Mirror conditions(??)
    • Clean around the center?


Beam Path from IMC to PRM (Yokozawa, and Akutsu)


Activities:

IMC to STM1

  • Beam clearance: OK

STM1/2

  • Mirror mount stability with cables
  • Beam positions on them
  • Trans beam from STM2

IFI to IMMT1

  • IFI injection: No clipping
  • Beam position on IMMT1
  • Trans beam of IMMT1
    • No change to ISS path?
    • ISS beam/CWP reflection beam extracting (??)
    • the beam paths are clear?
    • The beams hit around the center of windows?
    • The reflected beams on the windows are dumped?

IMMT1-IMMT2

  • Beam clearance: no problem
  • Beam position on IMMT2: shifted from the center.

IMMT2-PRM

  • Main beam/misaligned beam clearances: no problem against the beam dumper
  • The misaligned beam position: hits on the dumper(?) and the temp enhancement was detected.

Around PRM

  • Beam position on PRM
  • IR beam in the midsize baffles(HR/AR side)

Main Beam Dumper

Beam dump(T.Akutsu)


PRM Cleaning


PRM


Oplev Check for IMMT1. (Yokozawa-kun)


Activities:

Beam Power

Beam Path Clearance

  • IMMT1

QPD centering

Calibration

Spectrum Health

Oplev beam's stray light influence

  • almost no light? as before.

Oplev table covering

  • we will do this after closing.


ISS path


Check the path by Miyakawa-kun

  • ??


Vacuum system (Kimura/Uchiyama and their selected persons)


Close GV btw PRM and PR3 and stad bolt nut adjustment btw PRM and PR3

Clean inside as much as possible including the bellows duct with TMP

Check the flange seal surface condition where were opened.

  • KF400 flange with a Copperplate -> change with a curved flange.

Decide where the elastomer/Metal gasket will be used.

Logistic to reinstall the bellows duct with TMP.

  • Sawada-sana and Mirapro members call
  • If you use chain block, please be careful of its fixing

KAGRA/Recovery2024/IFIPRM (last edited 2024-05-02 21:18:00 by miyoki)