Differences between revisions 4 and 31 (spanning 27 versions)
Revision 4 as of 2024-04-27 08:27:28
Size: 2402
Editor: miyoki
Comment:
Revision 31 as of 2024-05-02 21:11:53
Size: 5601
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
Suspension Condition of IMMT1/2. (Takahashi, Ushiba) Suspension Condition of PRM, IMMT1/2. (Takahashi-san, Ushiba-kun)
Line 4: Line 4:
IMMT1/2 IMMT1/2, PRM
Line 7: Line 7:
    *
Line 9: Line 8:
    *
Line 11: Line 9:
    *     * IMMT1/2
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29314
      * Yaw Pico is at near the edge. --> Acceptable
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29313
      * Though the EQ stop frame on the XY stage is unstable, the jump of the TM pitch is within the Oplev range. --> Acceptable
    * PRM
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28380
      * The balance of the TM was recovered by regluing of three magnets.
      * The wire cramp on the IM for the TM was tightened.
      * Height adjustment.
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28710
      * Position measurement of the traverser.
     * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29366
Line 17: Line 27:
   * Fixing on tables is tight and reliable?
    *
   * Cable repair for the BF damper. The lead wires were glued to prevent direct touching of the wires to the coil bobbins.
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28712
   * Fixing the cable connector for SF LVDT
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28586
Line 20: Line 32:
   *
Line 22: Line 33:
   *
   * IMMT2: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29320
   * IMMT1: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29319
   * PRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29348
   * PRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29349
Line 30: Line 43:
 *Beam dump(T.Akutsu)
  * Beam shield
   *
  * Beam dumps were additionally added?
   * In basic, No. Relocation was done.
----
Beam Path from IMC to PRM (Yokozawa-kun, and Akutsu-kun)
----

Activities:
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29261 (Finalization of IFI-IMM-PRM: Day 1 PM)
  * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29271 (Comment to Finalization of IFI-IMM-PRM: Day 1 PM)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29273 (Finalization of IFI-IMM-PRM: Day 2)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29282 (Finalization of IFI-IMM-PRM: Day 3 AM)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29283 (Finalization of IFI-IMM-PRM: Day 3 PM)
  * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29285 (Comment to Finalization of IFI-IMM-PRM: Day 3 PM)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29299 (Finalization of IFI-IMM-PRM: Day 4)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29308 (Finalization of IFI-IMM-PRM: Day 5)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29334 (Finalization of IFI-IMM-PRM: Day 6)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29342 (Finalization of IFI-IMM-PRM: Day 7-1)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29343 (Finalization of IFI-IMM-PRM: Day 7-2)
Line 37: Line 61:
----
Beam Path from IMC to PRM (Yokozawa, and Akutsu)
----
IMC to STM1
 * Beam clearance: OK
Line 58: Line 81:
 * Beam position on IMMT2  * Beam position on IMMT2: shifted from the center.
Line 68: Line 91:
Beam Dumper
 * Thermometer works?
Main Beam Dumper
 * Thermometer works: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29340
 * Visual Inspection: after the IR recovery.
 * Beam Clearance: OK with the main IR beam


Beam dump(T.Akutsu)
  * some shiny remnant: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29343, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29342
  * Beam dumps were additionally added?
   * In basic, No. Relocation was done?

----
PRM Cleaning (Hirata-san, Aso-kun)
----
PRM
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29254 (April 17): Acceptable ?
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29244 (April 16)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29228 (April 15)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29216 (April 12)
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29202 (April 11)
Line 73: Line 114:
Oplev Check for IMMT1. (Yokozawa-kun) Oplev Check for PRM, IMMT1. (Yokozawa-kun)
Line 75: Line 116:

Activities:
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29337
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28916
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28897
Line 88: Line 134:
PYL Separation(after pumping?)
 *
Line 102: Line 145:
(6)Vacuum system (Kimura/Uchiyama and their selected persons) ISS path
Line 104: Line 147:
Clean inside as much as possible including bellows duct with TMP Check the path by Akutsu-kun
 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29384


----
Vacuum system (Kimura/Uchiyama and their selected persons)
----
Close GV btw PRM and PR3 and stad bolt nut adjustment btw PRM and PR3
 *

Clean inside as much as possible including the bellows duct with TMP
Line 108: Line 161:
 * KF400 flange with a Copper plate-> change with a curved flange.   *  * KF400 flange with a Copperplate -> change with a curved flange: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29377
Line 115: Line 167:
 * Sawada-sana nd Mirapro members call
 *
 * Sawada-sana and Mirapro members call
 * If you use chain block, please be careful of its fixing


Suspension Condition of PRM, IMMT1/2. (Takahashi-san, Ushiba-kun)


IMMT1/2, PRM

  • Mirror conditions(??)
    • Clean around the center?


Beam Path from IMC to PRM (Yokozawa-kun, and Akutsu-kun)


Activities:

IMC to STM1

  • Beam clearance: OK

STM1/2

  • Mirror mount stability with cables
  • Beam positions on them
  • Trans beam from STM2

IFI to IMMT1

  • IFI injection: No clipping
  • Beam position on IMMT1
  • Trans beam of IMMT1
    • No change to ISS path?
    • ISS beam/CWP reflection beam extracting (??)
    • the beam paths are clear?
    • The beams hit around the center of windows?
    • The reflected beams on the windows are dumped?

IMMT1-IMMT2

  • Beam clearance: no problem
  • Beam position on IMMT2: shifted from the center.

IMMT2-PRM

  • Main beam/misaligned beam clearances: no problem against the beam dumper
  • The misaligned beam position: hits on the dumper(?) and the temp enhancement was detected.

Around PRM

  • Beam position on PRM
  • IR beam in the midsize baffles(HR/AR side)

Main Beam Dumper

Beam dump(T.Akutsu)


PRM Cleaning (Hirata-san, Aso-kun)


PRM


Oplev Check for PRM, IMMT1. (Yokozawa-kun)


Activities:

Beam Power

Beam Path Clearance

  • IMMT1

QPD centering

Calibration

Spectrum Health

Oplev beam's stray light influence

  • almost no light? as before.

Oplev table covering

  • we will do this after closing.


ISS path


Check the path by Akutsu-kun


Vacuum system (Kimura/Uchiyama and their selected persons)


Close GV btw PRM and PR3 and stad bolt nut adjustment btw PRM and PR3

Clean inside as much as possible including the bellows duct with TMP

Check the flange seal surface condition where were opened.

Decide where the elastomer/Metal gasket will be used.

Logistic to reinstall the bellows duct with TMP.

  • Sawada-sana and Mirapro members call
  • If you use chain block, please be careful of its fixing