Size: 2564
Comment:
|
Size: 3292
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
* | |
Line 9: | Line 8: |
* | |
Line 11: | Line 9: |
* | * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29314 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29313 |
Line 20: | Line 19: |
* | |
Line 22: | Line 20: |
* | * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29320 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29319 |
Line 40: | Line 39: |
Activities: * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29261 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29271 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29273 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29282 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29283 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29285 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29299 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29308 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29334 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29342 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29343 |
Suspension Condition of IMMT1/2. (Takahashi, Ushiba)
IMMT1/2
- Mechanical Motion
- Smooth pico motion and its default position
- Gaps between magnets and coils
Gaps between EQ stoppers and mirrors -> confirmed less than 1mm.
- Electrical wirings
Coil resistances and inductances ->
Isolation of Wiring from coils to flanges(pico and mag-coil) ->
- Fixing on tables is tight and reliable?
- Smooth Mag-coil motion and balance and TFs
- Spectrum
- Mirror conditions(??)
- Clean around the center?
- Clean around the center?
- Beam dump(T.Akutsu)
- Beam shield
- Beam dumps were additionally added?
- In basic, No. Relocation was done.
- Beam shield
Beam Path from IMC to PRM (Yokozawa, and Akutsu)
Activities:
IMC to STM1
- Beam clearance: OK
STM1/2
- Mirror mount stability with cables
- Beam positions on them
- Trans beam from STM2
IFI to IMMT1
- IFI injection: No clipping
- Beam position on IMMT1
- Trans beam of IMMT1
- No change to ISS path?
- ISS beam/CWP reflection beam extracting (??)
- the beam paths are clear?
- The beams hit around the center of windows?
- The reflected beams on the windows are dumped?
IMMT1-IMMT2
- Beam clearance: no problem
- Beam position on IMMT2
IMMT2-PRM
- Main beam/misaligned beam clearances: no problem against the beam dumper
- The misaligned beam position: hits on the dumper(?) and the temp enhancement was detected.
Around PRM
- Beam position on PRM
- IR beam in the midsize baffles(HR/AR side)
Main Beam Dumper
- Thermometer works?
Stray light dumpers
Oplev Check for IMMT1. (Yokozawa-kun)
Beam Power
Beam Path Clearance
- IMMT1
QPD centering
Calibration
Spectrum Health
Oplev beam's stray light influence
- almost no light? as before.
Oplev table covering
- we will do this after closing.
Vacuum system (Kimura/Uchiyama and their selected persons)
Close GV btw PRM and PR3 and stad bolt nut adjustment btw PRM and PR3
Clean inside as much as possible including the bellows duct with TMP
Check the flange seal surface condition where were opened.
KF400 flange with a Copperplate -> change with a curved flange.
Decide where the elastomer/Metal gasket will be used.
Logistic to reinstall the bellows duct with TMP.
- Sawada-sana and Mirapro members call
- If you use chain block, please be careful of its fixing