Suspension Condition of IMMT1/2. (Takahashi, Ushiba)


IMMT1/2


Beam Path from IMC to PRM (Yokozawa, and Akutsu)


STM1/2

IFI to IMMT1

IMMT1-IMMT2

IMMT2-PRM

Around PRM

Beam Dumper


Oplev Check for IMMT1. (Yokozawa-kun)


Beam Power

Beam Path Clearance

QPD centering

Calibration

PYL Separation(after pumping?)

Spectrum Health

Oplev beam's stray light influence

Oplev table covering


(6)Vacuum system (Kimura/Uchiyama and their selected persons)


Clean inside as much as possible including bellows duct with TMP

Check the flange seal surface condition where were opened.

Decide where the elastomer/Metal gasket will be used.

Logistic to reinstall the bellows duct with TMP.