Differences between revisions 3 and 17 (spanning 14 versions)
Revision 3 as of 2024-04-08 09:26:09
Size: 1346
Editor: miyoki
Comment:
Revision 17 as of 2024-04-09 15:36:10
Size: 2126
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
IXC Recovery(20240407) IXC Recovery(20240409)
Line 6: Line 6:
   *    * Remeasure the adjusted cables.
   * Recovery of BF damper: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28613, https://klog.icrr.u-tokyo.ac.jp/osl/?r=28541, https://klog.icrr.u-tokyo.ac.jp/osl/?r=28862
Line 8: Line 9:
   *    * -> Judge in TF measurement
   * magnets: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28632
Line 10: Line 12:
   *    * -> Judge in TF measurement
Line 15: Line 17:
   *    * Done: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29013
Line 18: Line 20:
   *    * ITMX tower sensor: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29122,
   * IM/MN photosensors: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29121,
Line 20: Line 23:
   *    * ITMX: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29111
   * EQ stopper: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29040
   * Roll Adj: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28959
Line 22: Line 27:
  *   * MN: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29074
  * TM: check between closing SI.
 *Windows Cleaning
  * Done: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28788,

 * Tcam (Yokozawa and ChenDan, and Yamamoto)
  * Done: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28830
Line 25: Line 37:
 * X-Pcal homeworks
  *

 *Windows Cleaning
  *

 * Tcam (Yokozawa and ChenDan, and Yamamoto)
  *

 * TMSX optical system (Akutsu and his selected persons)
Line 37: Line 39:
  *   * not necessary
  * one photodetector was dead.
Line 40: Line 43:
  *   * WAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28851
  * NAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28798
  * IXA closing: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28887
Line 43: Line 48:
  * tie rod adjustment between EXC and TMSX to avoid stress when the only EXC side is pumped down.
Line 47: Line 51:
  * The broken cc-10 was replaced.
* N2 purge is necessary for EXV.
  * N2 purge is necessary for IXV.
Line 52: Line 55:
  * Connector change is required for the heat link suspensions.


IXC Recovery(20240409)