PR2,3,BS,SRM,SR2,SR3 Cleaning(Aso-kun, Hirata-san)


PR2: Acceptable after FCing

PR3: Slight dots could not be removed by even pure water. We accepted this situation.

No cleaning for BS, SRM, SR2, SR3


Suspension Condition of PR2, PR3, BS, SR3, SR2, SRM. (Takahashi-san, Ushiba-kun, Hirata-san)



Oplev Check for PR2,3,BS,SRM,SR2,SR3. (Yokozawa-kun)


Activities

Beam Power

Beam Path Clearance

QPD centering

Calibration

Spectrum Health

Oplev beam's stray light influence

Oplev table covering


Beam Path and Baffle Position



Leaked hermetic flange repair on BS



Vacuum system (Kimura/Uchiyama and their selected persons)


Open the GV between SRM-SR3, and Close the GV between SRM-OMC !!

Clean inside as much as possible including the bellows duct with TMP

Check the flange seal surface condition where were opened.

Decide where the elastomer/Metal gasket will be used.

Check the opened flanges and the top hut of PRM2, 3

Logistic to reinstall the bellows duct with TMP.