---- Suspension Condition of PR2, PR3, BS, SR3, SR2, SRM. (Takahashi-san, Ushiba-kun, Hirata-san) ---- PRM * Mechanical Motion * Smooth pico motion and its default position * Gaps between magnets and coils * Gaps between EQ stoppers and mirrors * PR2 * * The balance of the TM was recovered by regluing of three magnets. * The wire cramp on the IM for the TM was tightened. * Height adjustment. * * Position measurement of the traverser. *PR3 *BS *SRM *SR2 *SR3 * Electrical wirings * Coil resistances and inductances -> * * Isolation of Wiring from coils to flanges(pico and mag-coil) -> * * Cable repair for the BF damper. The lead wires were glued to prevent direct touching of the wires to the coil bobbins. * Fixing the cable connector for SF LVDT * Smooth Mag-coil motion and balance and TFs * Spectrum * PR2: * PR3: * BS: * SRM: * SR2: * SR3: * Mirror conditions(??) * Clean around the center? * |
Suspension Condition of PR2, PR3, BS, SR3, SR2, SRM. (Takahashi-san, Ushiba-kun, Hirata-san)
PRM
- Mechanical Motion
- Smooth pico motion and its default position
- Gaps between magnets and coils
- Gaps between EQ stoppers and mirrors
- PR2
- The balance of the TM was recovered by regluing of three magnets.
- The wire cramp on the IM for the TM was tightened.
- Height adjustment.
- Position measurement of the traverser.
- PR3
- BS
- SRM
- SR2
- SR3
- PR2
- Electrical wirings
Coil resistances and inductances ->
Isolation of Wiring from coils to flanges(pico and mag-coil) ->
- Cable repair for the BF damper. The lead wires were glued to prevent direct touching of the wires to the coil bobbins.
- Fixing the cable connector for SF LVDT
- Smooth Mag-coil motion and balance and TFs
- Spectrum
- PR2:
- PR3:
- BS:
- SRM:
- SR2:
- SR3:
- Mirror conditions(??)
- Clean around the center?
- Clean around the center?
PR2,3,BS,SRM,SR2,SR3 Cleaning
PR2
PR3
No cleaning for BS, SRM, SR2, SR3
Suspension Health check PR2,3, BS, SRM, SR2, SR3. (Takahashi-san, Ushiba-kun)
Oplev Check for PR2,3,BS,SRM,SR2,SR3. (Yokozawa-kun)
Activities:
Beam Power
Beam Path Clearance
QPD centering
Calibration
Spectrum Health
Oplev beam's stray light influence
- almost no light?
Oplev table covering
- we will do this after closing.
Beam path and Baffle Position
Leaked hermetic flange repair on BS
Vacuum system (Kimura/Uchiyama and their selected persons)
Clean inside as much as possible including the bellows duct with TMP
- maybe impossible from the only side hatches.
Check the flange seal surface condition where were opened.
Decide where the elastomer/Metal gasket will be used.
Check the opened flanges and the top hut of PRM2, 3
Logistic to reinstall the bellows duct with TMP.
- Sawada-sana and Mirapro members call
- If you use chain block, please be careful of its fixing
- Careful cramp tightening near oplevs.