Line 2: Line 2:
Suspension Condition of PR2, PR3, BS, SR3, SR2, SRM. (Takahashi-san, Ushiba-kun) PR2,3,BS,SRM,SR2,SR3 Cleaning
----
PR2

PR3

No cleaning for BS, SRM, SR2, SR3


----
Suspension Condition of PR2, PR3, BS, SR3, SR2, SRM. (Takahashi-san, Ushiba-kun, Hirata-san)
Line 42: Line 52:




----
PR2,3,BS,SRM,SR2,SR3 Cleaning
----
PR2

PR3

No cleaning for BS, SRM, SR2, SR3


----
Suspension Health check PR2,3, BS, SRM, SR2, SR3. (Takahashi-san, Ushiba-kun)
----




PR2,3,BS,SRM,SR2,SR3 Cleaning


PR2

PR3

No cleaning for BS, SRM, SR2, SR3


Suspension Condition of PR2, PR3, BS, SR3, SR2, SRM. (Takahashi-san, Ushiba-kun, Hirata-san)


PRM

  • Mechanical Motion
    • Smooth pico motion and its default position
    • Gaps between magnets and coils
    • Gaps between EQ stoppers and mirrors
      • PR2
          • The balance of the TM was recovered by regluing of three magnets.
          • The wire cramp on the IM for the TM was tightened.
          • Height adjustment.
          • Position measurement of the traverser.
        • PR3
        • BS
        • SRM
        • SR2
        • SR3
  • Electrical wirings
    • Coil resistances and inductances ->

    • Isolation of Wiring from coils to flanges(pico and mag-coil) ->

    • Cable repair for the BF damper. The lead wires were glued to prevent direct touching of the wires to the coil bobbins.
    • Fixing the cable connector for SF LVDT
  • Smooth Mag-coil motion and balance and TFs
  • Spectrum
    • PR2:
    • PR3:
    • BS:
    • SRM:
    • SR2:
    • SR3:
  • Mirror conditions(??)
    • Clean around the center?


Oplev Check for PR2,3,BS,SRM,SR2,SR3. (Yokozawa-kun)


Activities:

Beam Power

Beam Path Clearance

QPD centering

Calibration

Spectrum Health

Oplev beam's stray light influence

  • almost no light?

Oplev table covering

  • we will do this after closing.


Beam path and Baffle Position



Leaked hermetic flange repair on BS



Vacuum system (Kimura/Uchiyama and their selected persons)


Clean inside as much as possible including the bellows duct with TMP

  • maybe impossible from the only side hatches.

Check the flange seal surface condition where were opened.

Decide where the elastomer/Metal gasket will be used.

Check the opened flanges and the top hut of PRM2, 3

Logistic to reinstall the bellows duct with TMP.

  • Sawada-sana and Mirapro members call
  • If you use chain block, please be careful of its fixing
  • Careful cramp tightening near oplevs.