Size: 2285
Comment:
|
Size: 3752
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
Suspension Condition of PR2, PR3, BS, SR3, SR2, SRM. (Takahashi-san, Ushiba-kun) | PR2,3,BS,SRM,SR2,SR3 Cleaning |
Line 4: | Line 4: |
PRM | PR2 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29228 PR3 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29520 No cleaning for BS, SRM, SR2, SR3 * Did you eyeballs check during the beam path check? ---- Suspension Condition of PR2, PR3, BS, SR3, SR2, SRM. (Takahashi-san, Ushiba-kun, Hirata-san) ---- |
Line 6: | Line 18: |
* Smooth pico motion and its default position * Gaps between magnets and coils |
* Smooth pico motion and its default position: skip * Gaps between magnets and coils:skip |
Line 10: | Line 22: |
* * The balance of the TM was recovered by regluing of three magnets. * The wire cramp on the IM for the TM was tightened. * Height adjustment. * |
* (Recovery Work)https://klog.icrr.u-tokyo.ac.jp/osl/?r=28593 |
Line 16: | Line 24: |
*PR3 *BS *SRM *SR2 *SR3 |
* PR3 * (Recovery Work)https://klog.icrr.u-tokyo.ac.jp/osl/?r=28509 * BS * SRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29594 * SR2: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29595 * SR3: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29596 *SRMs total comments: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29612 |
Line 24: | Line 34: |
* | * PR2: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29429 * PR3: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29430 * BS : * SRM: * SR2: * SR3: |
Line 29: | Line 44: |
* OSEM conditions * RP2: (Recovery Work)https://klog.icrr.u-tokyo.ac.jp/osl/?r=28593 * RP3: (Recovery Work)https://klog.icrr.u-tokyo.ac.jp/osl/?r=28509 * BS : https://klog.icrr.u-tokyo.ac.jp/osl/?r=29156, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29379 * SRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29317, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29323, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29594 * SR2: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29315, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29322, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29595 * SR3: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29316, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29321, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29596 |
|
Line 33: | Line 57: |
* BS: * SRM: * SR2: * SR3: |
* BS: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28292, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29432 * SRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28373, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29584 * SR2: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28369, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29498 * SR3: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28368, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29199 |
Line 42: | Line 66: |
---- PR2,3,BS,SRM,SR2,SR3 Cleaning ---- PR2 PR3 No cleaning for BS, SRM, SR2, SR3 ---- Suspension Health check PR2,3, BS, SRM, SR2, SR3. (Takahashi-san, Ushiba-kun) ---- |
PR2,3,BS,SRM,SR2,SR3 Cleaning
PR2
PR3
No cleaning for BS, SRM, SR2, SR3
- Did you eyeballs check during the beam path check?
Suspension Condition of PR2, PR3, BS, SR3, SR2, SRM. (Takahashi-san, Ushiba-kun, Hirata-san)
- Mechanical Motion
- Smooth pico motion and its default position: skip
- Gaps between magnets and coils:skip
- Gaps between EQ stoppers and mirrors
- PR2
(Recovery Work)https://klog.icrr.u-tokyo.ac.jp/osl/?r=28593
- Position measurement of the traverser.
- PR3
(Recovery Work)https://klog.icrr.u-tokyo.ac.jp/osl/?r=28509
- BS
SRMs total comments: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29612
- PR2
- Electrical wirings
Coil resistances and inductances ->
- BS :
- SRM:
- SR2:
- SR3:
Isolation of Wiring from coils to flanges(pico and mag-coil) ->
- Cable repair for the BF damper. The lead wires were glued to prevent direct touching of the wires to the coil bobbins.
- Fixing the cable connector for SF LVDT
- OSEM conditions
RP2: (Recovery Work)https://klog.icrr.u-tokyo.ac.jp/osl/?r=28593
RP3: (Recovery Work)https://klog.icrr.u-tokyo.ac.jp/osl/?r=28509
BS : https://klog.icrr.u-tokyo.ac.jp/osl/?r=29156, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29379
SRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29317, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29323, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29594
SR2: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29315, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29322, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29595
SR3: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29316, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29321, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29596
- Smooth Mag-coil motion and balance and TFs
- Spectrum
- PR2:
- PR3:
BS: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28292, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29432
SRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28373, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29584
SR2: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28369, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29498
SR3: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28368, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29199
- Mirror conditions(??)
- Clean around the center?
- Clean around the center?
Oplev Check for PR2,3,BS,SRM,SR2,SR3. (Yokozawa-kun)
Activities:
Beam Power
Beam Path Clearance
QPD centering
Calibration
Spectrum Health
Oplev beam's stray light influence
- almost no light?
Oplev table covering
- we will do this after closing.
Beam path and Baffle Position
Leaked hermetic flange repair on BS
Vacuum system (Kimura/Uchiyama and their selected persons)
Clean inside as much as possible including the bellows duct with TMP
- maybe impossible from the only side hatches.
Check the flange seal surface condition where were opened.
Decide where the elastomer/Metal gasket will be used.
Check the opened flanges and the top hut of PRM2, 3
Logistic to reinstall the bellows duct with TMP.
- Sawada-sana and Mirapro members call
- If you use chain block, please be careful of its fixing
- Careful cramp tightening near oplevs.