Differences between revisions 7 and 12 (spanning 5 versions)
Revision 7 as of 2024-05-29 14:08:09
Size: 3752
Editor: miyoki
Comment:
Revision 12 as of 2024-05-30 07:53:33
Size: 5882
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 19: Line 19:
   * Gaps between magnets and coils:skip    * Gaps between magnets and coils :skip
Line 26: Line 26:
    * BS      * Position measurement of the traverser.
    * BS : https://klog.icrr.u-tokyo.ac.jp/osl/?r=29682
Line 31: Line 32:
  * IP adjustment
   * BS: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28359
Line 36: Line 39:
    * BS :     * BS : https://klog.icrr.u-tokyo.ac.jp/osl/?r=29088, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29014
Line 39: Line 42:
    * SR3:
   * Isolation of Wiring from coils to flanges(pico and mag-coil) ->
    *
   * Cable repair for the BF damper. The lead wires were glued to prevent direct touching of the wires to the coil bobbins.
   * Fixing the cable connector for SF LVDT
    * SR3:
Line 55: Line 55:
   * PR2:
   * PR3:
   * BS: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28292, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29432
   * PR2: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28674, https://klog.icrr.u-tokyo.ac.jp/osl/?r=28768, https://klog.icrr.u-tokyo.ac.jp/osl/?r=28770, https://klog.icrr.u-tokyo.ac.jp/osl/?r=28774,
   * PR3: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28808, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29648,
   * BS: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28292, https://klog.icrr.u-tokyo.ac.jp/osl/?r=28352, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29432
Line 72: Line 72:
Activities:
Activities
 * BS, SR2, SR3, SRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29670
Line 99: Line 99:
Beam path and Baffle Position Beam Path and Baffle Position
Line 101: Line 101:
 *   * IR
   * Optical beam alignment from BS to SRM
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29635
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29630
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29632
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29635
   * Mid baffles and stray light inspection around SR3, SR2, and SRM
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29629
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29636
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29642
  *GR
   * GRX
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28558
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28579
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28860
    * TMSX : https://klog.icrr.u-tokyo.ac.jp/osl/?r=29131
    * for IFI-PRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29261
    * for IFI-PRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29282
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29299
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29341
Line 103: Line 122:
   * GRY
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28689
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28827
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28847
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28861
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28898
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28920
    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29115

 * IR/GR arm alignment
  * X-arm:
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29346,
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29448,
   * Finesse: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29586
  * Y-arm: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29478
Line 107: Line 141:
 *  * Finished: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29146, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29088, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29146


PR2,3,BS,SRM,SR2,SR3 Cleaning


PR2

PR3

No cleaning for BS, SRM, SR2, SR3

  • Did you eyeballs check during the beam path check?


Suspension Condition of PR2, PR3, BS, SR3, SR2, SRM. (Takahashi-san, Ushiba-kun, Hirata-san)


  • Mirror conditions(??)
    • Clean around the center?


Oplev Check for PR2,3,BS,SRM,SR2,SR3. (Yokozawa-kun)


Activities

Beam Power

Beam Path Clearance

QPD centering

Calibration

Spectrum Health

Oplev beam's stray light influence

  • almost no light?

Oplev table covering

  • we will do this after closing.


Beam Path and Baffle Position



Leaked hermetic flange repair on BS



Vacuum system (Kimura/Uchiyama and their selected persons)


Clean inside as much as possible including the bellows duct with TMP

  • maybe impossible from the only side hatches.

Check the flange seal surface condition where were opened.

Decide where the elastomer/Metal gasket will be used.

Check the opened flanges and the top hut of PRM2, 3

Logistic to reinstall the bellows duct with TMP.

  • Sawada-sana and Mirapro members call
  • If you use chain block, please be careful of its fixing
  • Careful cramp tightening near oplevs.