PR2,3,BS,SRM,SR2,SR3 Cleaning
PR2
PR3
No cleaning for BS, SRM, SR2, SR3
- Did you eyeballs check during the beam path check?
Suspension Condition of PR2, PR3, BS, SR3, SR2, SRM. (Takahashi-san, Ushiba-kun, Hirata-san)
- Mechanical Motion
- Smooth pico motion and its default position: skip
- Gaps between magnets and coils :skip
- Gaps between EQ stoppers and mirrors
- PR2
(Recovery Work)https://klog.icrr.u-tokyo.ac.jp/osl/?r=28593
- Position measurement of the traverser.
- PR3
(Recovery Work)https://klog.icrr.u-tokyo.ac.jp/osl/?r=28509
- Position measurement of the traverser.
SRMs total comments: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29612
- PR2
- IP adjustment
- Electrical wirings
Coil resistances and inductances ->
- OSEM conditions
RP2: (Recovery Work)https://klog.icrr.u-tokyo.ac.jp/osl/?r=28593
RP3: (Recovery Work)https://klog.icrr.u-tokyo.ac.jp/osl/?r=28509
BS : https://klog.icrr.u-tokyo.ac.jp/osl/?r=29156, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29379
SRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29317, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29323, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29594
SR2: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29315, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29322, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29595
SR3: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29316, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29321, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29596
- Smooth Mag-coil motion and balance and TFs
- Spectrum
PR2: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28674, https://klog.icrr.u-tokyo.ac.jp/osl/?r=28768, https://klog.icrr.u-tokyo.ac.jp/osl/?r=28770, https://klog.icrr.u-tokyo.ac.jp/osl/?r=28774,
PR3: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28808, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29648,
BS: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28292, https://klog.icrr.u-tokyo.ac.jp/osl/?r=28352, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29432
SRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28373, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29584
SR2: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28369, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29498
SR3: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28368, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29199
- Mirror conditions(??)
- Clean around the center?
- Clean around the center?
Oplev Check for PR2,3,BS,SRM,SR2,SR3. (Yokozawa-kun)
Activities
All seem to be fine: BS, SR2, SR3, SRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29670
Beam Power
Beam Path Clearance
QPD centering
Calibration
Spectrum Health
Oplev beam's stray light influence
- almost no light?
Oplev table covering
- we will do this after closing.
Beam Path and Baffle Position
- IR
- Optical beam alignment from BS to SRM
- Mid baffles and stray light inspection around SR3, SR2, and SRM
- GR
- GRX
for IFI-PRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29261
for IFI-PRM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29282
- GRY
- GRX
- IR/GR arm alignment
Leaked hermetic flange repair on BS
Finished: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29146, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29088, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29146
Vacuum system (Kimura/Uchiyama and their selected persons)
Clean inside as much as possible including the bellows duct with TMP
- maybe impossible from the only side hatches.
Check the flange seal surface condition where were opened.
Decide where the elastomer/Metal gasket will be used.
Check the opened flanges and the top hut of PRM2, 3
Logistic to reinstall the bellows duct with TMP.
- Sawada-sana and Mirapro members call
- If you use chain block, please be careful of its fixing
- Careful cramp tightening near oplevs.