Differences between revisions 1 and 8 (spanning 7 versions)
Revision 1 as of 2024-04-24 21:23:48
Size: 729
Editor: miyoki
Comment:
Revision 8 as of 2024-04-24 22:04:28
Size: 2477
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
 * 2024-4-25  * 2024-April-25
Line 11: Line 11:
    * OMC-OOMT and Optics(Somiya): https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9819
    * Rubbers(Somiya)
    * Suspended Image by crane(Kimura, Node)
    * OMC-OMT and Optics(Somiya): https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9819
    * Rubbers(Somiya): メクラブッシュ検査成績書.pdf
 
  * Stack recovery policy :
   * Change all rubbers inside bellows with harder rubbers.
    * Preparation of rubbers and some parts for replacement (R.Takahashi-san)
   * Change all thick head bolts to thin head bolts
    *Do we have many such bolts? (R.Takahashi-san)
   * Questions
    * The optical table surface height can be set at the same level as before?
     * --> Just adjust the optical table height adjuster bolts?
    * The whole optics will rotate as a whole compared with before?
     * --> It can happen because the previous sit-on situation cannot always be realized again after each stack weight masses can be separated with each other. If so, all optical axis should be adjusted again in the OMC area?
    *
  * Logistic issues
   * Where should be opened?
    * Bellows duct with TMP should be removed for the final adjustment?
     * If so, it needs temporal stocking space as before.
   * Optical table suspension
    * todo list before suspension
     * Cables disconnection
     * OMC stage lock and some covering? FC should be applied on the OMC mirrors?
      * fragile PZT cables
     * OFI removal for keeping I-bolts setting?
     * OMMT1, OSM Mirror, and IM fixing
     * Covering for all with something or put floor KOACHs at both sides?
    * How to suspend the whole optical table
     * Suspended Image by crane(Kimura, Node):OMC隙間.pdf
     * Suspending Jig: (木村)中央2F防振室の前に仮保管されているφ980のアルミ板(t=40)の改造を提案されています。必要な穴開け加工と洗浄を黒部市のカナヤママシナリーに追加工依頼することになるかと。
    * Where and how is it put after taking out the OMC tank?


OMC Recover


  • 2024-April-25
    • OMC stack status
    • Stack recovery policy :
      • Change all rubbers inside bellows with harder rubbers.
        • Preparation of rubbers and some parts for replacement (R.Takahashi-san)
      • Change all thick head bolts to thin head bolts
        • Do we have many such bolts? (R.Takahashi-san)
      • Questions
        • The optical table surface height can be set at the same level as before?
          • --> Just adjust the optical table height adjuster bolts?

        • The whole optics will rotate as a whole compared with before?
          • --> It can happen because the previous sit-on situation cannot always be realized again after each stack weight masses can be separated with each other. If so, all optical axis should be adjusted again in the OMC area?

    • Logistic issues
      • Where should be opened?
        • Bellows duct with TMP should be removed for the final adjustment?
          • If so, it needs temporal stocking space as before.
      • Optical table suspension
        • todo list before suspension
          • Cables disconnection
          • OMC stage lock and some covering? FC should be applied on the OMC mirrors?
            • fragile PZT cables
          • OFI removal for keeping I-bolts setting?
          • OMMT1, OSM Mirror, and IM fixing
          • Covering for all with something or put floor KOACHs at both sides?
        • How to suspend the whole optical table
          • Suspended Image by crane(Kimura, Node):OMC隙間.pdf
          • Suspending Jig: (木村)中央2F防振室の前に仮保管されているφ980のアルミ板(t=40)の改造を提案されています。必要な穴開け加工と洗浄を黒部市のカナヤママシナリーに追加工依頼することになるかと。
        • Where and how is it put after taking out the OMC tank?

KAGRA/Recovery2024/OMC (last edited 2024-05-24 18:15:21 by RyutaroTakahashi)